Laserfiche WebLink
i <br /> part of the special permit decision or shall be noted on, ing developed by the Mashpee Housing Authority, to <br /> or referred to as an attachment to, any plan of land low or moderate income housing units as defined by <br /> to be recorded. Such phasing schedule may be subse- the Massachusetts Department of Community Affairs. <br /> quently modified by a majority vote of the Planning The provisions of Subsection 6.4.1 and 6.4.2 shall also r <br /> ,4 <br /> Board, provided that such modification is also consis- not apply to lots in subdivisions protected temporari- <br /> tent with Subsection 6.4.1.1 and is duly recorded as an ly from the provisions of this section by Massachusetts <br /> amendment to the special permit decision or recorded General Laws Chapter 40A, Section 6, except that <br /> plan of land. building permits for lots in said subdivisions shall be <br /> 6.4.1.3 counted toward the annual total building permit limits <br /> Any land for which a phasing schedule is approved of Subsection 6.4.2.1. <br /> under this subsection which is thereafter sold or other- 6.4.3.2 <br /> wise transferred to another owner shall include in the The provisions of Section 6.4 shall not apply to non- <br /> deed the earliest date on which a building permit or per- residential structures, accessory'structures, or altera- <br /> mits may be issued in accordance with the phasing tions or additions which do not create a new dwelling <br /> schedule and a specific reference to the date on which unit. <br /> said schedule was approved by the Planning Board. 6.4.4 Administration j <br /> Any request for modification of the phasing schedule 6.4.4.1 <br /> shall require the written approval of all land owners The Building Inspector shall compile and keep up-to- <br /> or persons with an ownership interest in any lands to date a listing of all subdivisions,special permit projects <br /> be ncluded in said modification and no modification <br /> and other lands which are exempt or protected tempor- <br /> shall be approved by the Planning Board until it has arily from the provisions of Section 6.4 either under a <br /> held a public hearing regarding said request with prop- <br /> Subsection 6.4.3 or under any applicable provisions of <br /> er public notice and notice to all parties in interest as Massachusetts General Laws and the date on which any <br /> required for the original project approval but includ- temporary protection will expire. <br /> ing, at a minimum, all abutters. <br /> 6.4.4.2 <br /> The Building Inspector shall determine prior to Jan- <br /> 6.4.2 Building Permit Limits <br /> uary 15 of any calendar year the number of existing ' <br /> 6.4.2.1 dwelling units in the Town on,plus any dwelling units (' <br /> Notwithstanding the provisions of Subsection 6.4.1, for which building permits were issued by, December <br /> within any year the number of new dwelling units for 31 of the previous year which have not expired.On the <br /> which building permits may be issued shall not exceed basis of that information and the provisions of Subsec- <br /> 2%z percent of the total of the number of existing dwell- tion 6.4.2.1 he shall determine the number of dwell- <br /> ing units in the Town on,plus any uncompleted dwell- ing units not exempted by Subsection 6.4.3.1 which <br /> ing units for which building permits have been issued may be issued permits during said calendar year. <br /> and have not expired by,December 31 of the previous 6.4.4.3. <br /> year, except that permits for 400 dwelling units may Applications for building permits for new dwelling <br /> be issued in 1987, permits for 300 dwelling units may units may be filed only during the first fifteen(15)days <br /> be issued in 1988 and permits for 200 dwelling units of any month. However, no such permits will be ap- <br /> may be issued in 1989. proved until after the fifteenth day of the month to al- <br /> low proper review and determination of the order of <br /> 6.4.2.2 priority in which they may be issued. <br /> Within any calendar month,building permits for new Permits which are exempted by Subsection 6.4.3 or <br /> dwelling units may be issued for not more than ten(10) temporarily protected by Massachusetts General Laws . <br /> percent of the number of new dwelling units allowed from the provisions of this section may be applied for <br /> during that year under Subsection 6.4.2.1.Within said or issued at any time. <br /> limit, the actual number of permits issued shall be at 6.4.4.4 <br /> the discretion of the Building Inspector provided the In issuing building permits,the Building Inspector shall <br /> annual limit specified by Subsection 6.4.2.1 is not first determine that the application and proposed struc- <br /> exceeded. ture conforms with the rules and regulations of the <br /> Board of Health, with any applicable building codes <br /> 6.4.3 Exemptions and with this Zoning By-Law,including the provisions <br /> of Subsection 6.4.1. For those applications which are <br /> 6.4.3.1 in conformance and may otherwise be issued,building <br /> The provisions of Subsections 6.4.1 and 6.4.2 shall not permits shall be issued, within the monthly limit,in the <br /> apply to Open Space Incentive Developments approved following order of priority: f.r. <br /> under Section 9.3, to developments previously ap- First — Provided that the annual limit has not been <br /> proved under an unexpired special permit which includ- exceeded, in the order of their receipt by the Building <br /> ed a specific annual phasing schedule,to public Nous- <br /> - 75 - <br /> t" <br />