Laserfiche WebLink
49 <br /> Waquoit Cut-Off <br /> Drainage $50.60 <br /> J <br /> R <br /> Total Expenditures $2,337.44 <br /> CHAPTER 90 - I� <br /> Great Neck Road <br /> Drainage $103.20 <br /> Brush 72.50 <br /> i <br /> $175.70 <br /> I <br /> Respectfully yours, <br /> I <br /> BERNAD CARTER, <br /> I <br /> Highway Surveyor. <br /> i <br /> I <br /> � 4 <br /> `A <br /> 1 <br /> I <br /> 4 <br /> li <br /> I. <br />