My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/19/2020 Annual Town Meeting
>
10/19/2020 Annual Town Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2025 9:19:20 AM
Creation date
2/11/2021 10:59:39 AM
Metadata
Fields
Template:
Town Meeting Warrants
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Motion To Be Made By Selectman Sherman <br />Motion: I move that the Town vote to approve Articles 10, 11, and 12 as printed in the <br />Warrant, with the exception of the phrases "or take any other action relating thereto." <br />Motion passes 76/50 at 7:47 pm <br />Article 13 <br />To see if the Town will vote to amend Section 174-24.B. of the Mashpee Zoning Bylaws as <br />follows: <br />3. Plan Review Committee Procedures. <br />a. The Plan Review Committee shall review said plans with regard to those items related <br />to the fields of expertise of its members and to determine whether they are consistent <br />with applicable state and town regulations, bylaws and plans and will not adversely <br />affect public health or safety, will not significantly decrease surface or groundwater <br />quality or air quality, will not have a significant adverse impact on wildlife habitat, <br />estuarine systems, traffic flow, traffic safety, waterways, fisheries, public lands or <br />neighboring properties and will not destroy or disrupt any species listed as rare <br />endangered or threatened by the Massachusetts Natural Heritage Program or any known <br />historic or archaeological site. <br />b. The site plan review shall include: <br />1. A pre -construction review of the site design, the planned operations at the <br />construction site, planned BMPs during the construction phase, and the planned <br />BMPs to be used to manage runoff created after development; <br />2. Receipt and consideration of information submitted by the public; <br />3. Evaluating the incorporation of Low Impact Development (LID) site planning <br />and design strategies, unless such practices are infeasible. <br />c. A determination shall be made by the Committee that the application may be approved, <br />that the application may be approved subject to certain specified conditions or changes, <br />that the application shall be denied for certain specified reasons or that additional <br />specific information is required. Unless an extended review period is agreed to in writing <br />by the applicant, failure of the Committee to make said determination within 21 days of <br />its receipt of a complete application shall be considered a constructive approval with no <br />conditions or changes. <br />d. Any decision of the Committee shall be filed thereafter with the Building Inspector and <br />recorded with the Town Clerk. In those cases where the Committee is acting in an <br />advisory capacity to the Planning Board or Zoning Board of Appeals regarding a <br />Special Permit application, the Committee shall forward its determination forthwith to <br />said Board. The determination of the Committee will not substitute for, or otherwise <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.