Laserfiche WebLink
Construction of the project is scheduled from 2021— 2023 (stopping seasonally during the summer <br />months). Construction is being funded through State and Federal monies. Phase II of the project, <br />(Old Barnstable Road to the Town line), will be completed at a later date yet to be determined. <br />The Board of Selectmen recommends approval of Article 17 by a vote of 5-0 <br />The Finance Committee recommends approval of Article 17 by a vote of 5-0 <br />Motion To Be Made By Selectman Cotton <br />Motion: I move that the Town vote to approve Article 17 as printed in the Warrant, with the <br />exception of the phrase "or take any other action relating thereto", and with the following <br />Plan reference substitution: "Massachusetts Department of Transportation Highway <br />Division Plan and Profile of Nathan Ellis Highway (Route 151) Corridor Improvements in <br />the Town of Mashpee, Barnstable County, Preliminary Right of Way Plans", 100% Design, <br />dated October 8, 2020, and prepared by Stantec Consulting Services, Inc.". <br />Motion passes unanimously at 8:06 pm <br />Article 18 <br />To see if the Town will vote to appropriate the sum of $490,200 for the purpose of paying costs <br />and expenses relating to the design of a public wastewater and stormwater collection system and <br />related facilities for the Route 151 corridor from Old Barnstable Road to the Falmouth town line, <br />including any and all costs incidental and related thereto, and to fund said appropriation, vote to <br />transfer the sum of $200,000 from Hotel/Motel receipts reserved for wastewater purposes, transfer <br />$40,200 from the Capital Stabilization Account, and "repurpose" the $250,000 sum previously <br />appropriated under Article 10 of the October 21, 2019 Annual Town Meeting from feasibility <br />planning related to a regional wastewater collection and treatment facility at Joint Base Cape Cod <br />to funding of the subject Route 151 corridor wastewater and stormwater collection system design, <br />or take any other action relating thereto. <br />Submitted by the Board of Selectmen <br />Explanation: This article would provide funding to design a wastewater and stormwater collection <br />system and other required facilities for the Route 151 corridor. This project would run concurrently <br />with the Route 151 Corridor Improvement Project. <br />The Board of Selectmen recommends approval of Article 18 by a vote of 5-0 <br />The Finance Committee recommends approval of Article 18 by a vote of 4-1 <br />Motion To Be Made By Selectman O'Hara <br />