My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-Annual Town Report
>
1999-Annual Town Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2022 9:32:56 AM
Creation date
2/19/2021 3:45:57 PM
Metadata
Fields
Template:
Annual_Town_Report
DocType
Annual Town Report
Year
1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Explanation: This article appropriates money to fund Permits already exist for the Popponesset Bay and <br /> required budget adjustments in the Building Waquoit Bay dredging; the cost ranges from$4.52 to <br /> Department and Planning Department. $7.00 per cubic yard depending on the length of pipe <br /> Recommendation: The Finance Committee recom- required. <br /> mends approval. Recommendation: The Finance Committee recom- <br /> Motion made by Selectman Leveille. <br /> mends approval. <br /> Motion made by Selectman Blythe. <br /> Motion: I move the Town vote to appropriate and <br /> transfer from Revenue Available for Appropriation Motion: I move the Town vote to appropriate and <br /> $1,053.64 to the Building Inspector Salary/Wage transfer $47,000 from the Waterways Improvement <br /> Account and $240 to the Planning Department Account said funds to be distributed as follows: <br /> Salary/Wage Account. $17,000 to the Waterways Equipment Account; <br /> Motion passes unanimously at 8:44 p.m. $30,000 to the Waterways Maintenance Account. <br /> a <br /> ARTICLE 8 Motion passes unanimously at 8:46 p.m. <br /> To see if the Town will vote to raise and appropriate or ARTICLE 10 <br /> transfer from available funds $35,000 to the Mashpee To see if the Town will vote to raise and appropriate or <br /> River Dredging Permit Account,to be expended under transfer from available funds $405,140 to the Sewer <br /> the direction of the Board of Selectmen, or take any Commission Facilities Plan Account, to be expended l <br /> other action relating thereto. under the direction of the Sewer Commission for con- t <br /> sultant services and associated costs related to the <br /> Submitted by the Waterways Commission I <br /> development of a Watershed Nitrogen Management <br /> Explanation: This article seeks supplemental funding Plan/Effluent Pipeline Preliminary Design,or take any <br /> for obtaining permits to dredge the Mashpee River. other action relating thereto. l <br /> Permits for dredging the Mashpee River are in the 1 <br /> process of being obtained, and costs of this effort are Submitted by Sewer Commission 1 <br /> expected to exceed the balance remaining in the Explanation: The Mashpee River, Ockway Bay, <br /> account previously established for this purpose. A Shoestring Bay,parts of Popponesset Bay and portions <br /> better estimate will be available by Town Meeting,but of the Waquoit Bay estuary have seen rapidly declin- r <br /> at this time we are using our best estimate. ing water quality, fish and shellfish kills caused by It <br /> Recommendation: The Finance Committee recom- inadequate oxygen levels, excessive algae, foul odors <br /> 4 mends approval. and other problems due largely to excessive nitrogen ; t <br /> levels. Those nitrogen levels result primarily from the / <br /> Motion made by Selectman Taylor. increasing levels of residential development in the <br /> watersheds of those bays and the use of traditional <br /> Motion: I move the Town vote to appropriate and <br /> septic systems for disposal of wastewater. In 1998 the I 11 <br /> transfer $35,000 from the Waterways Improvement <br /> Town funded the first phase of an effort to deal with <br /> Account to the Mashpee River Dredging Account. A <br /> Motion passes unanimousl at 8:45 m. those problems. That first phase, a study of critical <br /> y P• nitrogen levels in the Popponesset Bay estuary by Dr. T <br /> ARTICLE 9 Brian Howes and the U. Mass. Center for Marine h <br /> Science and Technology (CMaST), will identify the F <br /> To see if the Town will vote to raise and appropriate or level of nitrogen inputs which can be tolerated by the e <br /> _ transfer from available funds, $47,000 to be distrib- Mashpee River, Shoestring Bay, Ockway Bay and the C <br /> uted as follows: $17,000 to the Waterways Equipment main body of Popponesset Bay. This article would <br /> Account and $30,000 to the Waterways Maintenance fund the second phase of the project, involving devel- <br /> Account, to be expended under the direction of the o ment of similar information on tolerable nitrogen E <br /> Board of Selectmen, or take any other action relating levels for Hamblin Pond / Little River, Jehu Pond I fc <br /> thereto. Great River and the Quashnet River estuary, nitrogen p <br /> Submitted by the Waterways Commission modeling of alternative approaches to nitrogen reduc- ! cl <br /> And Harbormaster tion, and development, by a wastewater engineering fi <br /> for: firm, of a plan and preliminary design for the waste- . C <br /> Explanation: This article seeks fundin <br /> g water facilities and other measures required to reduce R <br /> Additional boat and navigational aid equipment as nitrogen loading to the tolerable levels identified by IT <br /> required, and, CMaST in the most cost-effective manner possible. , <br /> Performing maintenance dredging of the Po The funding amount requested is based on the fees IV <br /> PPonesset required for the additional work b CMaST and th <br /> Bay and Waquoit Bay channels when and as required. wastewater engineering firm. Approval of this article <br /> l <br /> 70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.