My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-Annual Town Report
>
2015-Annual Town Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2021 4:04:50 PM
Creation date
2/19/2021 4:04:50 PM
Metadata
Fields
Template:
Annual_Town_Report
DocType
Annual Town Report
Year
2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Preliminary design work continued for will be available for use by the Town and others for <br /> reconstruction and improvement of Route 151. The special events(see Annual Report from the Recreation <br /> project will ultimately include upgrading of the traffic Department). The project was funded through the <br /> signals,extension of the multi-use path along the entire Community Preservation Act. <br /> corridor in Mashpee,construction of a sidewalk from <br /> Old Barnstable Road to Winslow Drive, improvement Construction of the Mashpee Dog Park off <br /> of signage and lighting, and improvement/lane Attaquin Road was completed and opened in July 2015. <br /> reconfigurations at various intersections as well as The two-acre property includes a 12-vehicle parking <br /> reconstruction of the road itself. Construction funding lot and an approximately 1 acre off-leash fenced area <br /> for the project will be through the Cape Cod for dogs with site amenities including benches, <br /> Transportation Improvement Program and is tentatively climbing rocks,and water fountains. The project was <br /> scheduled for FY19. Design is being funded through funded through a grant. <br /> Chapter 90. Twenty-five percent (25%) design plans <br /> will be submitted to MassDOT in January 2016. Building Projects <br /> Major projects completed over the year on Town <br /> Special Projects buildings(all except the schools) were: replacement of <br /> Improvements at Great River Boat Ramp began. the chiller at Town Hall; renovation of the lower level <br /> The existing parking lot was reconstructed and offices at Town Hall; renovation of the former Human <br /> expanded to double its size for the 2015 boating season. Services building at 520 Main Street including new <br /> Work included installation of drainage and paving HVAC, windows, flooring, and handicap entrance (to <br /> through the binder course of asphalt. The work to date be completed by mid-January 2016). <br /> has been funded through the Community Preservation <br /> Act. Work was suspended over the summer and while Over the year, the following major work was <br /> the Town contemplated a re-design of the facility to completed in the three school buildings: at <br /> increase the boat ramp to a double wide ramp with a Middle/High School - flooring replacement in 5 <br /> separate kayak launch. Additional funds have been classrooms,renovation of the Culinary Arts Room; at <br /> requested for this re-design. Quashnet School — flooring in 4 classrooms; at K.C. <br /> Coombs School — upgrading of the HVAC system <br /> Construction of the access stairs over the artificial including replacement of boilers and domestic hot <br /> dune and planting of beach grass on said dune were water heaters and installation of demand control <br /> completed prior to the opening of South Cape Beach for ventilation (project funded through Green <br /> the season. As part of the improvement,a new mat was Communities grant and utility incentives;project to be <br /> installed to improve handicap accessibility for the beach. completed by Summer 2016). <br /> The South Cape Beach Shorefront Protection project was <br /> funded through a special appropriation at Town Meeting. Transfer Station <br /> At the end of 2014, the Town's 25-year contract <br /> A new playground(Phase 1)was built at Attaquin for solid waste disposal with SEMASS expired. The <br /> Park before the start of the beach season. The project Town signed a new contract with New Bedford Waste <br /> was funded through the Community Preservation Act. Services, effective January 1, 2015. Though the <br /> negotiated rate is better than offered by SEMASS,it still <br /> The top course of paving for the new parking lot represents an over 50% increase from the prior rate. <br /> at John's Pond Beach was completed. The project was <br /> funded through the Community Preservation Act. A In 2015, the Town collected 3,653 tons at the <br /> picnic pavilion will be erected in time for the 2016 Transfer Station,a 3% increase from 2014. <br /> season. <br /> For recycling, 2015 was the sixth full year for <br /> j Renovation of the Community Park and Veterans single stream recycling at the Transfer Station. With <br /> Garden, located on Collins Lane across from Town single stream recycling, all materials including <br /> Hall,was completed and a grand opening was held on newspaper, paper, magazines, cardboard, plastics, <br /> Memorial Day. The renovation included a construction glass, and metal cans can now be recycled together in <br /> of a pavilion,installation of lighting,expansion of the one container instead of separating it into 9 different <br /> parking,and construction of walking paths. The Park containers. <br /> 123 <br />
The URL can be used to link to this page
Your browser does not support the video tag.