My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-Annual Town Report
>
2015-Annual Town Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2021 4:04:50 PM
Creation date
2/19/2021 4:04:50 PM
Metadata
Fields
Template:
Annual_Town_Report
DocType
Annual Town Report
Year
2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The Commission is pleased to report that we, Commission is also following closely the studies being <br /> along with our consultants and the Shellfish Constable, done in Falmouth and other places regarding on-site <br /> completed the Final Recommended Plan/Final alternatives to sewers, although, to date, none has <br /> Environmental Impact Report for the WNMP in June demonstrated its feasibility at the scale required to meet <br /> and forwarded it for approval by the Massachusetts our mandated nitrogen targets. <br /> Environmental Policy Act Office (MEPA), DEP and <br /> the Cape Cod Commission(CCC). The Plan describes The Secretary of Energy&Environmental Affairs <br /> work to be done in five 5-year phases, plus a issued his Certificate that the Final Plan/Final EIR <br /> preliminary phase regarding completion of the Plan complies with the Massachusetts Environmental Policy <br /> review and approval process by DEP and the CCC. As Act on July 31. CCC review of the Plan as a <br /> each phase is completed, the condition of our Development of Regional Impact (DRI) began with a <br /> waterways and other factors will be analyzed to public hearing on July 14. The hearing was continued <br /> determine how well the plan is working toward to November 10, when we had hoped to get final <br /> achieving the TMDLs and whether or not adjustments approval by the CCC. However, at the request of <br /> need to be made to the Plan (a process referred to as Selectmen Gottlieb,for reasons noted below,the CCC <br /> "adaptive management"). This adaptive management hearing has been continued to May 16,2016. As part <br /> approach has become particularly important as the Plan of the CCC process, the Plan will have to be found <br /> relies heavily on the proposal by Shellfish Constable consistent with the CCC's recently adopted "Section <br /> Rick York to remove a significant portion of the water 208 Plan", which was approved by the EPA in <br /> column nitrogen load through seeding and commercial September. The Chairman and other Commissioners <br /> harvesting of large numbers (millions) of shellfish, participated in a number of workshops over the last <br /> using Quahogs in Hamblin and Jehu Ponds,Great and year as part of the development of the 208 plan. <br /> Little Rivers and Ockway Bay, and a significant <br /> expansion of current oyster propagation efforts in the Once our Plan is fully-approved, the Town can <br /> Mashpee River,Shoestring Bay and Popponesset Bay. qualify for 0% interest loans for wastewater facilities <br /> The oyster propagation efforts are also being enhanced primarily intended to prevent nutrient enrichment of <br /> by the Wampanoag Tribe. In conjunction with water bodies or water supplies. The loans, however, <br /> sewering and other nitrogen reduction measures such are only available to applicants who have adopted land <br /> as stormwater bio-retention areas, development use controls intended to limit wastewater flows to the <br /> controls and land purchases to reduce "buildout" amount authorized by zoning and wastewater <br /> population and other measures, shellfish seeding and regulations as of the date DEP approves our Plan (so- <br /> commercial harvesting on a large scale may make called"growth neutral"regulations). The 0%loans are <br /> meeting the TMDL targets for Hamblin and Jehu Ponds available only until 2019, in competition with other <br /> and Great River possible on their own, and also similar projects around the state, so we have a strong <br /> ultimately reduce the area of the Town that has to be incentive to fund implementation of our wastewater <br /> sewered in other watersheds (thus reducing resulting plan as soon as possible and to adopt the required <br /> costs by about half from previous estimates) while regulations (as was done by Falmouth in 2014). The <br /> providing local jobs and economic development. Commission will propose adoption of such regulations <br /> Should the shellfish proposal prove as effective as in 2016. <br /> hoped, only the first two or three phases of sewer <br /> facility construction would be required to meet the As noted,our CCC hearing has been continued to <br /> TMDLs (shellfish cannot meet the TMDLs on their May of 2016. This is intended to allow the Town, <br /> own in the Mashpee River and Shoestring Bay sub- along with Barnstable and Sandwich, to negotiate a <br /> watersheds, or at all in the Quashnet/Moonakis River "watershed-based permit" for the Popponesset <br /> sub-watershed, meaning that significant sewer watershed which would legally define the <br /> construction will still be required in those sub- responsibilities of each town in funding and <br /> watersheds). As each 5-year phase is completed and implementing the measures needed to meet the TMDL <br /> water quality results become known, it may be targets for Popponesst Bay. This would be the first <br /> necessary to construct portions or all of the later phases such permit issued by DEP in the state. Funding for <br /> of the proposed sewer facilities if the shellfish option the effort was included in a Selectmen's article <br /> does not produce the hoped-for results. The approved at the October 2015 Town Meeting. Should <br /> 153 <br />
The URL can be used to link to this page
Your browser does not support the video tag.