Laserfiche WebLink
support that visible opinion. The test results for each River/Little River boat ramp project. We are <br /> summer testing period are analyzed by SMAST's unanimously supporting the project revision from a <br /> computers and presented to the Town in the following single ramp project to a double ramp project along with <br /> April/May timeframe. various Town Departments/Commissions. This project <br /> expansion will improve public access. The expansion <br /> Other Committee Work is required to facilitate the public's use of the ramp for <br /> The Waterways Commission is working with the both pleasure boating and commercial fishing. <br /> engineering firm of BSC Group to complete our filing Commercial Fishing will support the Town's Shellfish <br /> for a comprehensive dredging permit that will Propagation Program that is recommended by Mr. <br /> encompass our three existing dredging permits. This York, the Town's Shellfish Constable. The Program <br /> work should be completed sometime in Calendar 2016. will reduce nitrogen content in the waterways via a <br /> State and Federal agencies are in receipt of the natural process thus reducing the size of required future <br /> engineers data and have the data under review. sewerage treatment facilities. This program will <br /> generate a major cost savings to the Town. This <br /> The State has issued our joint Chapter 91 license savings could be as high as 25% of future facilities <br /> and 401 Water Quality Certificate as well as our CZM <br /> Q Y costs which would amount to an estimated 100 million <br /> (Coastal Zone Management) Federal Compliance dollars of savings. It will also support the efforts of the <br /> Certificate. The COE comment period for their new new/revised DNR Department. <br /> Comprehensive 10 year Permit runs from December <br /> 15, 2015 through January 15, 2016. Depending on The Waterways Commission is working with the <br /> comments received, we anticipate receipt of the COE Town/DPW to support efforts to rebuild/replace the <br /> Permit in Calendar 2016. This new Permit format will Ockway Bay boat ramp walkway/float system. The <br /> save the Town thousands of dollars that would present walkway/float system was trashed by"Mother <br /> normally be required to be spent on Permit renewals Nature" during the winter months (January,February, <br /> over the same time period. and March) of 2015. <br /> The Waterways Commission has, in hand, the The Waterways Commission is working with the <br /> Town's Permit to complete our annual maintenance Town/DPW to make similar repairs/replacement of the <br /> dredge of the Popponesset Approach Channel in walkway/float system located at the Pirates Cove boat <br /> February/March of Calendar 2016. This was the ramp. <br /> culmination of a major work effort in Calendar 2015. <br /> The Waterways Commission is performing <br /> The Waterways Commission is working on preliminary review/planning work regarding an <br /> improvement of moorings and use regulations for application for a channel maintenance dredge Permit <br /> boating and personal watercraft operation on Johns for Ockway Bay. This would improve boating safety <br /> Pond. Our efforts will support the monitoring efforts and navigation from Popponesset Bay to the Ockway <br /> provided by the Harbormaster and his department. Bay boat ramp. <br /> The Waterways Commission has under review an Members of the Waterways Commission <br /> update of signage for our Public Access areas in volunteer to work on various subjects/committees both <br /> support of the Town and the Harbormaster department. within as well as outside the Commission. Some <br /> examples are as follows: <br /> The Waterways Commission has under review a <br /> dinghy storage rack system for ramp and mooring field Barnstable County Coastal Resources Committee <br /> areas throughout the Town that is in preliminary stages. Public Access Committee <br /> This will be a joint departmental effort that will be <br /> announced as soon as we complete the organization and Mashpee Sewer Commission Planning <br /> it is approved by the Town Manager and the Board of Committee <br /> Selectmen. Mashpee Local Multiple Hazard Community <br /> The Waterways Commission has been and is Planning Team <br /> presently working diligently to improve the Great Barnstable County Dredge Advisory Committee <br /> 160 <br />