My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-Annual Town Report
>
2014-Annual Town Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2021 4:05:43 PM
Creation date
2/19/2021 4:05:42 PM
Metadata
Fields
Template:
Annual_Town_Report
DocType
Annual Town Report
Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
during Hurricane Sandy). Access stairways over the Building Projects <br /> dune and planting of beach grass on the dune will be Major projects completed over the year on Town <br /> completed in spring 2015. This project was funded buildings(all except the schools)were installation of a <br /> through a special appropriation at Town Meeting. Some new cooling tower and new two air handler units at the <br /> reimbursement may be received from FEMA. Police Station (this completes the replacement of the <br /> entire HVAC system),installation of access control on <br /> A new splash pad was added to the playground the exterior doors at the Senior Center,and replacement <br /> facilities at Heritage Park. It opened July 4th weekend of the doors on one of the salt sheds at DPW. <br /> and proved to be overwhelming popular throughout the <br /> remainder of the summer. The splash pad consists of Over the year, the following major work was <br /> eight different water features, from ground sprays to completed in the three school buildings: at all 3 <br /> misting tunnel loops to overhead waterfalls, and Schools — rekeying of interior and exterior doors, <br /> provides families with a safe recreational opportunity installation of access control on exterior doors, <br /> for all age groups. The project was funded through the addition/replacement of security cameras and servers; <br /> Community Preservation Act. at Middle/High School — flooring replacement in 4 <br /> classrooms, replacement of flooring in 4 stairwells, <br /> Improvements to John's Pond Beach were replacement of the air conditioning chiller,upgrades to <br /> undertaken in spring prior to the beach season. The the Wastewater Treatment Facility;at Quashnet School <br /> parking lot was reconfigured and the base course of —replacement of bleachers in the gym,replacement of <br /> paving, with drainage, was completed. A new the HVAC system throughout the building(univents in <br /> playground was installed. The project was funded each classroom, installation of an EMS system, <br /> through the Community Preservation Act. Additional replacement of exhaust fans), replacement of folding <br /> funds are being requested at the May 2015 Town walls with permanent walls in 16 classrooms, new <br /> Meeting for the top course of paving and the erection of cafeteria exit door; at KC Coombs School — <br /> a picnic pavilion. replacement of HVAC air handler unit. <br /> Design for renovation of the Community Park Renovation of the Town's Archives building was <br /> and Veterans Garden, located on Collins Lane across completed. The majority of work was performed by <br /> from Town Hall, was completed and site work was the DPW and included the replacement of the electrical <br /> started. The project will include a pavilion, lighting, and mechanical systems,re-insulation of the building, <br /> and walking paths for use by the Town and others for replacement of the windows and doors,and addition of <br /> special events. The project is also funded through the a public bathroom. A new accessible ramp into the <br /> Community Preservation Act. A grand opening is building from the parking lot with lighting was also <br /> tentatively scheduled for Memorial Day 2015. constructed. The building will re-open in May 2015. <br /> The project is funded through the Community <br /> A new inclusive playground for the preschool Preservation Act. <br /> classes at KC Coombs was constructed. The <br /> playground is 100% handicap accessible and includes For more information on these and other capital <br /> play structures specifically designed for 3-5 year olds building projects, please see the reports from the <br /> which promote development of physical,cognitive,and Planning & Construction Committee and the Energy <br /> sensory skills. Funding was received from the Committee. <br /> Community Preservation Act, the School Department <br /> and donations. Transfer Station <br /> In 2014, the Town of Mashpee delivered 5,596 <br /> Finally, the parking lot at the Quashnet School tons of Municipal Solid Waste (MSW) to SEMASS <br /> was redesigned and reconstructed over the summer. through the Upper Cape Regional Transfer Station. <br /> The redesign included changing the configuration for This amount includes both the tonnage collected at the <br /> school buses accessing the school, shifting the drop- Transfer Station as well as the tonnage collected by <br /> off/pick-up from the front to the rear. This improved private haulers curbside from residents. At the Transfer <br /> safety for students and also allowed additional parking Station,3,563 tons were collected,a 1%increase from <br /> to be constructed at the front of the school,for special 2013. <br /> events as well as elections. With the reconstruction, <br /> new drainage and exterior lighting were also provided. <br /> 116 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.