Laserfiche WebLink
• Horticulture built walkways on campus and 7 <br /> serviced the campus grounds irrigation system. Report of the <br /> Sewer Commission <br /> • Roots and Roses floral shop utilized Facebook <br /> and public venues with the goal of increasing <br /> opportunities for student hands-on experiences. To the Honorable Board of Selectmen and the <br /> Citizens of the Town of Mashpee: <br /> • HVAC students repaired equipment in the school <br /> such as installing air conditioning in Adult As reported in previous years,the Massachusetts <br /> Education Office,and in two shop areas. Department of Environmental Protection (DEP) and <br /> the U.S.Environmental Protection Agency(EPA)have <br /> • Welding students made visits to both large established nitrogen loading targets for both the <br /> industry sites and local shops, and were visited Popponesset Bay (including Shoestring Bay,Mashpee <br /> by two technical colleges who presented River,Ockway Bay,Popponesset Creek and Pinquikset <br /> opportunities after graduation. Cove)and"East Waquoit"(including Sedge Lot Pond, <br /> Jehu Pond,Great and Little Rivers,Hamblin Pond and <br /> • The Information Technology shop instituted a the Quashnet/Moonakis River) estuaries (final targets <br /> new safety program for students aligned to both have not yet been established for the main body of <br /> state and OSHA frameworks. Waquoit Bay or Childs River). These formal nitrogen <br /> targets, referred to as TMDLs (Total Maximum <br /> • All freshmen passed the Engineering Technology allowed Daily Loads of nitrogen), are required by the <br /> MCAS with proficient or advanced scores. federal Clean Water Act. The Town (along with the <br /> other towns which share the Bays'watersheds)is faced <br /> • In the Plumbing Shop, 90 percent of students with the need to determine how we will meet those <br /> passed the Tier Three test. targets. Mashpee's Watershed Nitrogen Management <br /> Plan(WNMP) project is intended to identify the most <br /> • Eighty-three (83) qualified students participated cost-effective approach to reducing nitrogen in each of <br /> in placements for Cooperative Education, our coastal watersheds to levels that meet the targets, <br /> Internships, and Student Practicums for real-life while also dealing with phosphorus impacts to our <br /> work experience. ponds and protection of overall water quality. <br /> • CCRTHS continued to address capital needs from During 2014, the Sewer Commission made <br /> the long range capital plan this summer with the significant progress toward completing the WNMP. <br /> ireplacement of the school's electrical switchgear Following up on the work done and the reports <br /> (approximately $380,000). However, CCRTHS completed in previous years, including the Needs <br /> also continues to seek a partnership with the Assessment Report, the Technology Screening <br /> Massachusetts School Building Authority Analysis Report, the Draft Alternative Screening <br /> (MSBA) for a major renovation or replacement Evaluation and Site Evaluation Report, the Final <br /> of the facility because remaining physical plant Alternatives Screening Analysis Report, and the <br /> issues exceed the capacity of the operating Massachusetts Estuaries Program (MEP) reports <br /> budget. analyzing the ability of a series of alternative scenarios <br /> for reducing nutrient contamination to meet the TMDL <br /> Please visit our website: www.caoetech.us for nitrogen targets,the major product of this year's efforts <br /> more information. by the Commission and our consultants was the"Draft <br /> Respectfully submitted, Recommended Plan/Draft Environmental Impact <br /> Report". The Plan describes work to be done in five 5- <br /> Scott P. McGee and David Bloomfield year phases, plus a preliminary phase regarding <br /> CCRTHS School Committee completion of the Plan review and approval process by <br /> the DEP and the Cape Cod Commission. As each <br /> phase is completed,the condition of our waterways and <br /> other factors will be analyzed to determine how well <br /> the Plan is working toward achieving the TMDLs,and <br /> 143 <br />