My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-Annual Town Report
>
2014-Annual Town Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2021 4:05:43 PM
Creation date
2/19/2021 4:05:42 PM
Metadata
Fields
Template:
Annual_Town_Report
DocType
Annual Town Report
Year
2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
yards of sediment, which gets deposited on the test results will support that visible opinion. Test <br /> Popponesset Spit. The Spit is managed in close results for FY14 will be reviewed in the April 2015 <br /> relationship with the Town by organizations named timeframe. <br /> Save Popponesset Bay and the Audubon Society,land <br /> owners of the Popponesset Spit. Other Committee Work <br /> The Waterways Commission is working with the <br /> Some of these dredge projects are done by what engineering firm of BSC Group to complete our filing <br /> is called a"short haul"dredge (less than 4,000 feet of for a comprehensive dredging permit which will <br /> pipe) and some are done as a"long haul"dredge(over encompass our three existing dredging permits. This <br /> 4,000 feet of pipe). A booster barge is required for the work should be completed sometime in FY 15. State <br /> "long haul"projects,as this propels the sediment down and Federal agencies are in receipt of the engineers data <br /> the pipe for longer distances. and have it under review. <br /> The 1916 Channel project is performed as a Two new members were appointed to the <br /> "short haul"dredge and the sediment gets deposited on Waterways Commission after receipt of two members' <br /> the Popponesset Spit. The Approach Channel dredge resignations. Members of the Commission volunteer <br /> is a "long haul" dredge and the sediment is also to work on various subjects/committees both within as <br /> deposited on the Spit. well as outside the Commission. Some examples are as <br /> follows: <br /> In Popponesset Bay,a sand delta formed over the <br /> years and started its drift toward Cotuit Meadows. The Barnstable County Coastal Resources Committee <br /> result was that the channel known as the 1916 Channel Public Access Committee <br /> (originally dredged in 1916)became very shallow and <br /> required a maintenance dredge. The most recent Mashpee Sewer Commission Planning <br /> maintenance dredge was performed in 1936,making it Committee <br /> necessary to locate documentation of that project in the Mashpee Local Multiple Hazard Community <br /> State Archives. We found a copy of the dredge <br /> Planning Team <br /> contract,issued by the State,which enabled us to get a <br /> maintenance dredge permit from the Corps of Barnstable County Dredge Advisory Committee <br /> Engineers(COE)for this much-needed dredge project. Mashpee-Wakeby Lake Management Committee <br /> The project was completed with a"long haul" dredge <br /> in FYI 0,and the sediment was pumped to Popponesset State TOY (time of year) Restrictions Working <br /> Spit. A follow-up maintenance dredge was performed Committee <br /> in December 2012(FY 13). South Cape Beach Advisory Committee <br /> Improvement Dredging Respectfully submitted, <br /> We resumed work two years ago on the Kenneth Bates,Chairman <br /> engineering portion of an improvement dredge of the Donald MacDonald, Vice-Chairman <br /> Mashpee River Entrance and River. This effort has Al Wickel,Secretary <br /> been underway for a number of years,and the disposal Tim Leedham <br /> process of the sediment has been the Town's major William Taylor <br /> hurdle. Our efforts to get this done should improve the Donald Barton <br /> flushing effects of tidal changes on the Mashpee River. Stanton Healy <br /> Since finding a location for sediment disposal is --+^ <br /> proving to be very difficult for Mashpee and all Cape <br /> towns,it should be noted that,with the dredging of the <br /> 1916 Channel in the Bay,the flushing of Popponesset , {( <br /> Bay has improved. The Water Quality test data from 01 14 l' <br /> the summer of 2011 showed a slight improvement in f <br /> - the southern part of the Bay. It appears the clarity of ` <br /> water in the Bay has improved and, hopefully, future <br /> 151 <br />
The URL can be used to link to this page
Your browser does not support the video tag.