Laserfiche WebLink
Construction of Phase II of a Community <br /> Report of the Garden was completed in May 2010. Phase H <br /> Department of Public Works included provision of 5 additional raised garden beds, <br /> construction of small parking area and walkways,and <br /> erection of a shed for gardeners. Funding for the pro. <br /> To the Honorable Board of Selectmen and the ject was provided through the Community <br /> Citizens of the Town of Mashpee: Preservation Act. <br /> In 2010, the Department of Public Works per- Design of a sidewalk along the entire length of <br /> formed its normal operations for maintaining the town Great Neck Road North continued. The sidewalk will <br /> roads, buildings, and properties including Heritage be constructed in conjunction with <br /> Park, South Cape Beach, the Transfer Station, and the reconstruction/drainage of the road. Completion of <br /> cemeteries. the design is scheduled for 2011. Construction of the <br /> Below are highlights of several specific activities Project will be undertaken in phases with tree and <br /> during the past year. drainage work scheduled for Spring 2011 and side- <br /> walk/road construction tentatively scheduled for Fall <br /> sy <br /> Road Projects 2011. The project is being funded through Chapter <br /> Extension of the bike path on Route 130 from 90. <br /> Heritage Park to Pickerel Cove Road was completed <br /> in September 2010. The 3/a mile project results in the The Town received funding through the Cape <br /> Cod Water Resource Restoration Project for three pro- <br /> total length for the 8-foot wide path of approximately ects a Federally-funded g project <br /> H, 3'/a miles. This project was funded through mitigation Y program. One is <br /> completion of drainage improvements on Mashpee <br /> monies from the Cape Cod Commission and the DPW <br /> I <br /> xpense budget. Neck Road. The project's goal is to improve water <br /> quality in Shoestring Bay, valuable shellfish habitat. <br /> Reconstruction of Donna's Lane was completed Design for this project is underway. Construction is <br /> in Fall 2009. Funding for the project was provided expected in 2011. Another project is completion of a <br /> through Chapter 90. breach analysis for the Santuit Pond Dam and John's <br /> x� <br /> Pond Dam. The analysis is necessary for design for <br /> Conversion of Forest Drive as well as the roads improvement/reconstruction of the dams. Completion <br /> in the Quashnet Valley neighborhood off Old is expected in early 2011. The third project is <br /> design/reconstruction of the Santuit Pond Dam and <br /> Barnstable Road and the roads in The Highlands <br /> neighborhood off Route 28 from private to public was fish ladder. The project's goal is to bring the earthen <br /> completed in Fall 2010. dam into compliance with current state and federal <br /> standards and improve fish passage over the dam, <br /> Special Projects Substantial completion is expected in 2011. <br /> r?, <br /> k# Construction of three new playing fields at Building Projects <br />$' Heritage Park was completed (two soccer, one base- <br /> n' ball). Completion of the last new field,a softball field, Through 100% funding from the Cape Light <br /> is expected in Spring 2011. Funding for this project Compact, energy efficiency improvements were made <br /> was provided through the Community Preservation at the DPW and Mashpee High/Middle School. At the <br /> Act. DPW,both interior and exterior lighting was replaced. <br /> This has resulted in a savings of almost 50% of elec- <br /> Also at Heritage Park, a new full-size regulation tricity costs. At the High/Middle School, the motors <br /> basketball court was constructed in June 2010 to on the circulation pumps for the HVAC system were <br /> replace the existing undersized court. At the Mashpee replaced with Variable Frequency Drives, resulting in <br /> High/Middle School, three of the existing tennis an electricity savings. <br /> courts were repaired and resurfaced in July 2010. <br /> Drainage was installed in the football practice field Also at the DPW, the garage heating system was <br /> over the summer. replaced with an infrared system. The resulting sav- <br /> ings in natural gas costs is again almost 50%. This <br /> j 108 <br />