My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-Annual Town Report
>
2010-Annual Town Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2021 4:07:55 PM
Creation date
2/19/2021 4:07:54 PM
Metadata
Fields
Template:
Annual_Town_Report
DocType
Annual Town Report
Year
2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EPA under the Act. The Town is faced with the need <br /> Report of the to identify how we will meet those targets. <br /> Sewer commission The only remaining portion of Mashpee not cov- <br /> ered by an MEP report or TMDL is the extreme west- f <br /> x To the Honorable Board of Selectman and the ern part of the town,including most of the Johns Pond <br /> Citizens of the Town of Mashpee: Estates,Winslow Farms and Childs River West subdi- <br /> visions. These areas will be covered by an MEP <br /> The Commission went through major changes in report for Waquoit Bay, Childs River and Eel River i <br /> 2010, with the loss of two members and the change which is being undertaken by the UMass-Dartmouth <br /> from a three to a seven member makeup. Early in the School of Marine Science & Technology (SMaST) <br /> year, Donald Desmarais resigned from the and is jointly funded with the Town of Falmouth. <br /> Commission and Matthew Berrelli moved from (Mashpee Town Meeting provided 25%, or $23,625, <br /> Mashpee. Both put in more than 5 years of much of the MEP report costs.). <br /> appreciated work on the Commission. In May, six <br /> new members were appointed by the Selectmen. Once TMDLs for most of our watersheds were <br /> determined, our engineering consultant, GHD (for- <br /> Much of the next four months was dedicated to merly Stearns & Wheler, LLC), completed a "Final <br /> bringing the new members up to speed on the nitrogen Needs Assessment Report" in April 2007, analyzing <br /> problem in our estuaries, the cleanup targets devel- existing environmental resources and demographics, <br /> oped by the state's Massachusetts Estuaries Program existing wastewater infrastructure, wastewater flows <br /> for the Popponesset Bay and "Waquoit Bay East" and nitrogen loading,nitrogen loading targets,develop- <br /> estuaries and. adopted as "Total Maximum Daily ment of wastewater nitrogen priority areas, a summary <br /> Loads" (TMDL's) by EPA, the technologies available of needs and a discussion of funding opportunities. In <br /> for dealing with wastewater collection and treatment November 2007 a "Final Technology Screening <br /> and the work completed previously on the Report" was delivered, identifying all of the potential <br /> Commission's Watershed Nitrogen Management Plan wastewater treatment, sewering and effluent discharge <br /> l Effluent Pipeline Preliminary Design (WNMP) pro- technologies and identifying their favorable and unfa- <br /> ject. The NMP project is intended to identify the vorable characteristics, costs and effectiveness. <br /> W <br /> most cost-effective approach to reducing nitrogen in <br /> each of our coastal watersheds to levels that do not At a series of meetings with our Community <br /> harm the bays. By late fall, the Commission was Advisory Committee (CAC) and consultants, five <br /> ready to move forward with the next steps in the plan- alternative scenarios were proposed for dealing with <br /> ning process,distilling the five nitrogen removal"sce- wastewater nitrogen. Four scenarios were developed <br /> narios"that had been developed and tested previously by GHD and delivered in March 2008. One involved <br /> down to more specific plans. A proposed draft plan leaving existing private sewer systems in place and <br /> was.developed, and as of the end of the year had been public sewering of the rest of the watersheds,one used <br /> distributed to three wastewater collection system ven- acquisition of some of the existing private treatment <br /> dors for development and costing of preliminary col- plants as the basis for a municipal system, one aban- <br /> lection system plans. doned all of the private plants and created a large tra- <br /> ditional public sewer system for the whole area, and <br /> As reported in previous years,the Massachusetts one presumed that each of the towns in the <br /> Department of Environmental Protection (DEP) Popponesset and Waquoit watersheds "goes it alone" <br /> Massachusetts Estuaries Program (MEP) modeled rather than cooperating on the most cost-effective <br /> nitrogen loading and pathways, and established nitro- watershed-based approach (inter-municipal coopera- <br /> gen loading targets,for both the Popponesset Bay and tion and cost-sharing will be a major issue that must <br /> omil Quashnet River/ Hamblin's Pond/Jehu Pond water- be addressed by Mashpee and the surrounding three <br /> sheds ("Waquoit Bay East"). The recommendations towns). A fifth scenario was developed by a second <br /> from these reports were used by DEP to set formal consultant, Lombardo Associates, Inc. in July 2008, <br /> nitrogen targets, the TMDLs, for each of the sub- based on neighborhood"cluster" systems using Septic <br /> embayments of our estuaries. TMDLs,to be enforced Tank Effluent Pump (STEP) sewers and "Nitrex" <br /> by DEP,are required by the federal Clean Water Act, wastewater treatment technology for smaller clusters <br /> and the DEP TMDL reports have been approved by or other treatment technologies for larger clusters <br /> 137 <br />
The URL can be used to link to this page
Your browser does not support the video tag.