My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-Annual Town Report
>
2011-Annual Town Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2021 4:09:52 PM
Creation date
2/19/2021 4:09:52 PM
Metadata
Fields
Template:
Annual_Town_Report
DocType
Annual Town Report
Year
2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
) <br /> the proposed plans on the Town's website at <br /> Capital al Needs Bond <br /> www.mashpeema.gov. Any comments regarding the <br /> plan can be sent to the Planning Board. I would like to The May 2011 ATM approved a$1.5 bond for <br /> take this opportunity to thank Mashpee Commons LP completion of capital improvements at various Town <br /> representative, Douglas Storrs, for his insight during buildings. The specific improvements had beetidentified through an assessment completed by a <br /> these meetings, and the Cape Cod Commission Staff, <br /> consultant hired by the Town. The consultant evaluated <br /> for their assistance and expertise on this matter. <br /> five buildings including the Town Hall, Archives, <br /> We thank all of the Mashpee residents who took Police Station, K.C. Coombs School, and Quashnet <br /> the time to come before the Board with comments on School and developed a maintenance/capital <br /> project proposals. Your input is invaluable and is improvement plan for the buildings,with priorities and <br /> always welcome. As always,the Board is indebted to cost estimates. The evaluation assessed the condition <br /> our excellent supporting staff:Town Planner F.Thomas of the building envelope(roof,windows,exterior walls) <br /> Fudala, Consulting Engineer Charles Rowley, and and the building systems(HVAC,electrical,plumbing). <br /> Board Secretary Jennifer Clifford, without whom it <br /> would be difficult for the Board to fulfill its duties and Through this bond, projects completed in 2011 <br /> responsibilities. included replacement of a membrane roof at Town <br /> Hall, replacement of the roof at the KC Coombs <br /> The Planning Board conducts public meetings on Elementary School (both membrane and shingle),and <br /> the first and third Wednesdays of each month at 7:00 replacement/repair of the roof at the Quashnet <br /> p.m. at the Mashpee Town Hall, unless otherwise Elementary School (membrane). All of these roofs <br /> posted. Planning Board meetings are televised live on were original to the buildings and were in poor <br /> Channel 18 and public information is available on the condition with a number of leak areas. Also, in <br /> Planning Department website at www.mashpeema.gov. conjunction with the solar roof project at the <br /> Middle/High School, the seams of the membrane roof <br /> Respectfully Submitted, - where the solar panels were installed were replaced. <br /> Mary Elaine Waygan, Chairman This will extend the life of the 15-year roof and avoid <br /> Joseph E. Mullin,Esq., Vice-Chairman costs associated with removal of the panels for future <br /> George Petersen, Clerk roof repairs. <br /> Dennis Balzarini <br /> David Kooharian Other projects included in the capital bond for <br /> completion over the next several years include HVAC <br /> improvements at the Town Hall and Police Station, <br /> Report of the replacement of a roof at the Police Station,and design <br /> of new HVAC systems at the KC Coombs and <br /> Planning & Construction Quashnet Schools. <br /> Committee <br /> Green Communities Grant <br /> Through Mashpee's designation as a Green <br /> To the Honorable Board of Selectmen and the Community, the Town received grant monies for <br /> Citizens of the Town of Mashpee: implementation of energy efficiency projects. The <br /> projects completed in 2011 with these funds include <br /> The Planning & Construction Committee was replacement of the boiler at the Police Station and <br /> appointed by the Board of Selectmen in August 2005 to replacement of components of the HVAC system at the <br /> oversee capital improvements to the Town's facilities KC Coombs School (two air handler units). The <br /> as well as the construction of new buildings. The equipment installed replaced older, less efficient <br /> primary focus of the Committee during the year was equipment and should result in an energy savings for <br /> the construction of the new library. Below is a the two buildings. A third project still under <br /> summary of projects from the past year. construction is the replacement of additional <br /> components of the HVAC system at the Police Station <br /> (23 individual heat pumps). Again, a savings in both <br /> electrical and natural gas use is expected once this <br /> project is completed. <br /> _aa. ,, <br /> 116 <br />
The URL can be used to link to this page
Your browser does not support the video tag.