Laserfiche WebLink
Massachusetts School Building Authority for a grant <br /> Report of the to assist with construction costs. <br /> Planning & Construction <br /> Committee Green Communities Grant <br /> Through Mashpee's designation as a Green !, <br /> Community, the Town received grant monies for <br /> To the Honorable Board of Selectmen and the implementation of energy efficiency projects. From <br /> Citizens of the Town of Mashpee: the FY12 grant, one project was still outstanding in <br /> 2012. This project, replacement of additional <br /> The Planning & Construction Committee was components of the HVAC system at the Police Station <br /> appointed by the Board of Selectmen in August 2005 to (23 individual heat pumps), was completed in early <br /> oversee capital improvements to the Town's facilities 2012. A small grant was received in FY13 for <br /> as well as the construction of new buildings. The insulation and lighting improvements at Town Hall,KC <br /> primary focus of the Committee during the year was Coombs School, and the Middle/High School. These <br /> the construction of the new library. Below is a improvements will be completed in 2013. <br /> I' <br /> z summary of projects from the past year. <br /> Archives <br /> Capital Needs Bond The May 2011 ATM approved funding through <br /> The May 2011 ATM approved a $1.5 bond for the Community Preservation Act for renovation of the <br /> s completion of capital improvements at various Town Archives at 13 Great Neck Road North. This building <br /> buildings. The specific improvements had been houses the documents, maps, photographs, artifacts, <br /> identified through an assessment completed by a and other items important to the Town's history. The j <br /> consultant hired by the Town. The consultant evaluated work proposed for the renovation include accessibility <br /> five buildings including the Town Hall, Archives, improvements(the building is currently not accessible), j <br /> Police Station, K.C. Coombs School, and Quashnet HVAC replacement (including humidity control), and <br /> School and developed a maintenance/capital fire suppression installation. The original construction <br /> improvement plan for the buildings,with priorities and bids received in May 2012 exceeded the available <br /> cost estimates. The evaluation assessed the condition budget; these bids were rejected. New bids were <br /> of the building envelope (roof, windows, exterior solicited in June with a reduced scope of work. These <br /> walls) and the building systems (HVAC, electrical, bids too exceeded the available budget and were <br /> t <br /> plumbing). rejected. A third solicitation for bids was issued in <br /> October. When the low bid again exceeded the budget, <br /> Through this bond,the only project completed in the Board of Selectmen voted to form a subcommittee <br /> 1 2012 was replacement of the shingle roof at the Police to review options for the project. A decision on how to <br /> Station other roof projects were completed in 2011 . <br /> ( P J P ) proceed is expected in early 2013. � <br /> HVAC improvements at the Town Hall originally <br /> included in the bond, specifically installation of an For other building-related projects,please refer to <br /> energy management system, were completed instead the DPW and Energy Committee annual reports. <br /> With funding through Cape Light Compact. <br /> Design/engineering for HVAC improvements at the Respectfully Submitted, <br /> Police Station, including replacement of the cooling Steven Cook,Chairman <br /> tower,replacement of several air handler units, and Irving Goldberg, Vice-Chair j <br /> upgrade of the energy management system,has been Joseph Brait <br /> completed. The project will be bid for construction in Eugene Smargon j <br /> early 2013. Janice Mills (resigned) j <br /> Other projects included in the capital bond for <br /> completion over the next several years include design <br /> of new HVAC system at the KC Coombs School and <br /> design of a new HVAC system/window replacement at <br /> the Quashnet School. The design work is on hold for <br /> both projects pending an application to the <br /> PP <br /> , I <br /> 125 <br /> i <br />