Construction associated with re-construction of <br /> Report of the Great Neck Road North continued. The project which <br /> Department of Public Works will be completed in phases through 2013 will include <br /> re-alignment of several intersections, installation of a <br /> traffic signal at Lowell Road,installation of drainage, <br /> To the Honorable Board of Selectmen and the and construction of a sidewalk along the west side in <br /> Citizens of the Town of Mashpee: addition to reconstruction of the road itself. In 2012, <br /> In 2012, the Department of Public Works per- <br /> re-alignment of the intersection of Collins Lane with <br /> Great Neck Road North was completed as was instal. <br /> formed its normal operations for maintaining the town lation of multiple new drainage systems along the <br /> roads, buildings, and properties including Heritage road. A contract for installation of the traffic signal <br /> Park,South Cape Beach,the Transfer Station,and the was awarded. Construction of retaining walls neces- <br /> cemeteries. sary for the sidewalk was started. This project is <br /> Below are highlights of several specific activi- being funded through Chapter 90. <br /> ties during the past year. Special Projects <br /> Road Projects Another project funded through the Cape Cod <br /> As indicated in prior years' reports, the Town Water Resource Restoration Project (CCWRRP) is <br /> design/reconstruction of the Santuit Pond Dam and <br /> received funding through the Cape Cod Water fish ladder. The project's goal is to bring the earthen <br /> Resource Restoration Project (CCWRRP) for three <br /> projects, a Federally-funded program. One project is dam into compliance with current state and federal <br /> completion of drainage improvements on Mashpee standards and improve fish passage over the dam, <br /> Design and permitting of the dam was completed in <br /> Neck Road. The project's goal is to improve water December. The invitation for bids for construction <br /> quality in Shoestring Bay, valuable shellfish habitat. <br /> These improvements and reconstruction of the entire services was issued in mid-December. A contract will <br /> length of Mashpee Neck Road were completed in be awarded in early 2013 with construction to begin <br /> May. The stormwater improvements were funded immediately. Work is scheduled to be completed by <br /> through the CCWRRP. The remaining road improve- July 2013. <br /> ments were funded through Chapter 90. Six solar-powered artificial water circulators <br /> Reconstruction of Old Barnstable Road from were installed in Santuit Pond in late March. Their <br /> Great Neck Road North to Lowell Road was com- purchase was funded through the Community <br /> pleted in August. The existing sidewalk was extended Preservation Act. The purpose of the circulators is to <br /> from the KC Coombs School to the Quashnet School. improve water quality and minimize algal bloom in <br /> This project was funded through Chapter 90. the pond. Over the summer months, the algal bloom <br /> was visibly reduced/eliminated. The testing com- <br /> Conversion of the following private roads to pleted in October showed a 50% improvement. The <br /> public roads was approved at the October Town circulators will remain and operate in the pond year- <br /> Meeting: Timberland Shores (Hemlock, Beechwood, round. Testing will continue to be conducted at vari- <br /> Attaquin, Hornbeam, Lantern, Pocknomett, Autumn, ous times to measure their affect on the ponds water <br /> Elm, Holly, Fir); Quail Hollow Road; Shorewood quality. <br /> Drive; Sarakumitt Village (Park Place,Burning Bush, <br /> Scenic, Wood Haul,Noisy Hole); Sandy Fox Dr and The parking lot at the Town Archives and <br /> Community Park at 13 Great Neck Road North was <br /> Fox Hill Rd; Ockway Bay Road;Pleasant Park Drive; expanded. The new parking lot provides approxi, <br /> Santuit Woods (Shields, Lyn, Tricia, Michele, mately 74 spaces for events and activities that may be <br /> Tobisset,Pequot Road and Court,Nobska). Work was scheduled at the park. Construction of the parking lot <br /> begun in Timberland Shores and on Quail Hollow <br /> Road. (finish course of pavement) will be completed in con- <br /> junction with proposed improvements to the park. <br /> 130 <br />