Laserfiche WebLink
i <br /> During 2012, a Draft MEP Report, jointly <br /> Report of the funded by Mashpee and Falmouth (Mashpee Town <br /> Sewer Commission Meeting provided 25%,or$23,625,of the MEP report <br /> costs),was also released for the main body of Waquoit <br /> Bay, Childs River and Eel River in Falmouth. After <br /> To the Honorable Board of Selectmen and the public and agency review of the Draft Report,a Final <br /> Citizens of the Town of Mashpee: MEP Report and TMDLs are expected to be promul- <br /> During 2012 the Commission continued to make <br /> gated in 2013. However, one finding of the new <br /> Report, in revisiting the modeling of the "East <br /> progress toward completing the Watershed Nitrogen Waquoit" portions of the overall Waquoit Bay water- <br /> Management Plan (WNMP), intended to serve as a shed, is that significantly more nitrogen is stored in, <br /> blueprint for solving the severe nutrient-caused water <br /> quality problems in our bays and ponds and meeting and is being released from accumulated bottom sedi- <br /> menu (the result of previous decades' nitrogen loads <br /> the state and federal regulatory targets set for nitrogen and algae growth and die-off) into the waters of <br /> levels in our estuaries.Three plan options,focused on Hamblin and Jehu Ponds ("benthic flux") than was <br /> finding appropriate discharge areas for treated waste- <br /> water and identifying how the towns in the previously assumed. This has made the task of clean- <br /> ing up those water bodies and meeting their TMDL <br /> Popponesset and Waquoit Bay watersheds can share targets much more problematic than we expected,as <br /> the responsibility for their cleanup,were forwarded to there is more nitrogen entering the water column in <br /> UMass-Dartmouth in the spring for testing with the those ponds from benthic flux than from wastewater <br /> Massachusetts Estuaries Program (MEP) models of and other sources,meaning that even complete sewer- <br /> the Popponesset and "East Waquoit" watersheds. ing of those watersheds now does not appear to meet <br /> Results were received in November,which will guide the TMDL targets. <br /> preparation of a draft final WNMP and implementa- <br /> tion plan in 2013. The plan will then be submitted to However, there is growing evidence that it may <br /> DEP, MEPA and the Cape Cod Commission for be possible, based on the work of our Shellfish <br /> required approvals. Constable Rick York and others, to remove a signifi- <br /> cant portion of the water column nitrogen load <br /> As reported in previous years,the Massachusetts through seeding of large numbers (millions) of shell- <br /> Department of Environmental Protection (DEP) fish, using Littlenecks in Hamblin and Jehu Ponds, <br /> Massachusetts Estuaries Program engaged the Great and Little Rivers and Shoestring Bay,and asig- <br /> UMass-Dartmouth School of Marine Science and nificant expansion of current oyster propagation <br /> Technology and other sub-consultants to model nitro- efforts in the Mashpee River and Popponesset Bay. <br /> gen loading and pathways, and establish nitrogen Both DEP and EPA have recently indicated s willing- <br /> loading targets,for both the Popponesset Bay (includ- ness to consider the inclusion of such efforts in our <br /> ing Shoestring Bay, Mashpee River, Ockway Bay, WNMP In conjunction with sewering and other nitro- <br /> Popponesset Creek and Pinquikset Cove) and "East gen reduction measures such as stormwater bio-reten- <br /> Waquoit" (including Sedge Lot Pond, Jehu Pond, tion areas,fertilizer restrictions,development controls <br /> Great and Little Rivers, Hamblin Pond and the and land purchases to reduce "buildout" population <br /> Quashnet / Moonakis River) estuaries. The recom- and other measures,shellfish seeding and commercial <br /> mendations from these reports were used by DEP to harvesting on a large scale may both make meeting the <br /> set formal nitrogen targets, the TMDLs (Total TMDL targets for Hamblin and Jehu Ponds possible, <br /> Maximum allowed Daily Loads of nitrogen),for each and also ultimately reduce the area of the Town that <br /> of those estuaries. TMDLs, enforced by DEP, are has to be sewered(thus reducing resulting costs)while <br /> required by the federal Clean Water Act, and those providing local jobs and economic development.For <br /> DEP TMDL reports have been approved by EPA those reasons,the Commission strongly supports Mr, <br /> under the Act.The Town is faced(along with the other York's proposals. We are also following closely the <br /> towns which share the Bays' watersheds) with the studies being done in Falmouth and other places <br /> need to determine how we will meet those targets.The regarding alternatives to sewers, although, to date, <br /> WNMP project is intended to identify the most cost- none has demonstrated its feasibility at the scale <br /> effective approach to reducing nitrogen in each of our required to meet our mandated nitrogen targets. <br /> coastal watersheds to levels that meet the targets. <br /> 162 <br />