My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-Annual Town Report
>
2012-Annual Town Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2021 4:10:54 PM
Creation date
2/19/2021 4:10:54 PM
Metadata
Fields
Template:
Annual_Town_Report
DocType
Annual Town Report
Year
2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
progress has been slow in negotiations between the and financing strategies for developing the facilities <br /> Selectmen and Commissioners over the terms of the and practices needed to clean up our waterways. <br /> special legislation required to achieve that end. It is Among other issues,we will have to devise a fair clivi_ <br /> hoped that a resolution may come in 2013.The Sewer sion of the large costs involved between individual <br /> Commission continues to support that concept, with betterments and general property taxes,and determine <br /> the potential for substantial savings over separate how best to deal with developments that already have <br /> water and sewer organizations. Ultimately the matter private sewer systems (which would need to be <br /> will have to be decided by the voters. However,even upgraded to help meet the TMDLs). The <br /> if such a District is created it will still be necessary to Commission's Watershed Nitrogen Management Plan <br /> determine how the Town and the District will coordi- will have major water quality,land use and fiscal ram- <br /> nate the various long-term efforts required of each ifications for the Town, so we invite all residents to <br /> (e.g. wastewater facilities by the District, shellfish, actively participate in its development through our <br /> stormwater and regulatory programs by the Town) to meetings and public hearings, by visiting our <br /> achieve our ultimate goal and legal responsibility to www.mashpeewaters.com web site,by applying to the <br /> clean up our waterways. Selectmen to fill the above-mentioned vacancies and <br /> by reviewing and commenting on the draft reports we <br /> It had been noted in our 2011 Report that,as part generate. It took decades for our waterways to get <br /> of the expansion of the "Breezy Acres" affordable into their current poor condition and it will probably <br /> housing development on Old Barnstable Road, the take a long time to clean them up,but we are now at <br /> Commission is taking on responsibility for Mashpee's the point when we must decide how to do it,who will <br /> first public sewer line,connecting the development to do it, and how to fund it. Your continued support for <br /> the Mashpee High School wastewater treatment plant. our work and participation in this decision making <br /> The Commission.established a rate and management process will be sincerely appreciated. <br /> agreement for the project in 2011. However, con- <br /> struction of the housing project has been delayed,with Respectfully submitted, <br /> groundbreaking now projected for 2013. F.Thomas Fudala, Chairman <br /> Oskar H.Klenert, Vice Chairman <br /> With the resignation of Jack Malarkey,who did Mark N. Gurnee, Clerk <br /> yeoman's work for the Commission and our public Joseph N.Lyons <br /> outreach program,the Commission again found itself Thomas F.Burns <br /> three members short. However,as a result of the arti- L. Glenn Santos <br /> cle passed at the October 2011 Town Meeting which <br /> allows the Selectmen to appoint replacement members <br /> who do not live in specific precincts,we were able to ' <br /> welcome new members Thomas Burns and L. Glenns <br /> Santos to the Commission at our November meeting. <br /> Mr.Burns brings many years of experience as a waste- <br /> water treatment plant operator and former member of <br /> our Community Advisory Committee, while Mr. <br /> Santos, recently retired from the Barnstable DPW, <br /> served eight years on our Board of Health. One seat <br /> remains vacant and available to any interested <br /> Mashpee resident.With Mr.Burns appointment to the <br /> Commission,there are also now Community Advisory <br /> Committee vacancies for Precincts 2 and 4 and the <br /> Mashpee Wampanoag Tribal Council, for which the <br /> Commission would greatly appreciate volunteers as <br /> we move into the critical final stages of planning. <br /> The Commission and Mashpee officials and res- <br /> idents have serious work cut out for us over the next <br /> year to complete the WNMP and to identify funding <br /> 164 <br />
The URL can be used to link to this page
Your browser does not support the video tag.