My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-Annual Town Report
>
2012-Annual Town Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2021 4:10:54 PM
Creation date
2/19/2021 4:10:54 PM
Metadata
Fields
Template:
Annual_Town_Report
DocType
Annual Town Report
Year
2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
'I <br /> own <br /> We are honored to serve as Town Counsel for dredge" (over 4,000 feet of )• <br /> P p i e A booster barge is <br /> the Town of Mashpee, and we remain committed to required for the "long haul" projects and this propels <br /> providing the Town with high quality, cost-effective, the sediment down the pipe for longer distances. <br /> and timely legal advice and representation. We look <br /> forward to working with the Town Manager, the The Waquoit project is performed as a "short <br /> Selectmen,and other officers,boards and agencies of haul"project and the approximately 2,500 cubic yards <br /> the Town to secure and advance the interests of the of sediment gets deposited on the adjacent beach <br /> Town of Mashpee in 2013. (Will's Work Road). <br /> Respectfully submitted, In Popponesset Bay a sand delta formed over the <br /> Patrick J.Costello,Esq. years and started its drift toward Cotuit Meadows. The <br /> Louison, Costello, Condon &Pfaff,LLP result was the channel known as the 1916 Channel <br /> Town Counsel (originally dredged in 1916) became very shallow and <br /> required a maintenance dredge. The most recent main- <br /> tenance dredge was performed in 1936 so we had to <br /> Report of the find documentation of that project in the State <br /> Waterways Commission Archives. We found a copy of the dredge contract, <br /> issued by the State, which enabled us to get a mainte- <br /> nance dredge permit from the COE (Corps of <br /> To the Honorable Board of Selectmen and the Engineers) for this much needed dredge project. That <br /> Citizens of the Town of Mashpee: project was completed with a long haul dredge in Fiscal <br /> 2010. The sediment was pumped to the Spit. A follow <br /> The Waterways Commission presently meets on up maintenance dredge was performed in December of <br /> a monthly basis to deliberate on Waterways related 2012. The timing of this effort was such that the <br /> topics. Our goal is to maintain and improve the water- Barnstable County Dredge was in place and set to <br /> ways and strive to improve water quality of the bays dredge but storm"Sandy" and the follow on nor'easter <br /> and ponds in Mashpee. To this end we work with the delayed our start until the weather cleared. The Spit <br /> Harbormaster and the Shellfish Constable(both now a ended up after these storms in poor shape but after we <br /> part of the Mashpee Police Department) to oversee deposited our sediment on the Spit and Save The Bay <br /> maintenance dredging and plan and manage improve- maintenance dredged washover sediment from the <br /> ment dredging. We also have assumed the manage- Creek and placed their sediment on the Spit it appears <br /> ment roll of the Water Quality measurement and test- to be stabilized for the time being. Save the Bay will <br /> ing program in concert with the Town, the Tribe and perform additional Channel maintenance dredging <br /> SMAST with Dr. Brian Howes. This is an all volun- which will place additional sediment on the Spit. <br /> teer testing program and we are always looking for <br /> peoples to volunteer their time to assist this effort. IMPROVEMENT DREDGING <br /> This testing program is an ongoing project and should We are resuming work on the engineering por- <br /> continue well into the future. tion of an improvement dredge of the Mashpee River <br /> MAINTENANCE DREDGING Entrance and River. This effort has been underway for <br /> a number of years and the disposal process of the sed- <br /> Our efforts were totally consumed in fiscal 2012 iment has been the major hurdle. Our efforts to get <br /> with dredging of the Approach Channel of Popponesset this done should improve the flushing effects of tidal <br /> Bay, the Little River/Great River Channel of Waquoit changes on the River. Finding a location for sediment <br /> Bay. A typical maintenance dredge of the Approach disposal is proving to be very difficult. It should be <br /> Channel to Popponesset produces 5,000 cubic yards of noted that with the dredging of the 1916 Channel in <br /> sediment that also gets deposited on the Popponesset the Bay the flushing of Popponesset Bay has <br /> Spit. The Spit is owned and managed in a close rela- improved. The Water Quality test data from the sum- <br /> tionship with the Town by an organization named Save mer of 2011 showed a slight improvement in the <br /> Popponesset Bay. Some of these dredge projects are southern part of the Bay. No algae blooms or fish kills <br /> done by what is called a"short haul dredge"(less than were noticed in the River this past summer. It appears <br /> 4,000 feet of pipe) and some are done as "long haul the clarity of water in the Bay has improved and hope- <br /> fully the test results will support that visible opinion. <br /> 168 <br />
The URL can be used to link to this page
Your browser does not support the video tag.