My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-Annual Town Report
>
2013-Annual Town Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2022 11:40:14 AM
Creation date
2/19/2021 4:11:47 PM
Metadata
Fields
Template:
Annual_Town_Report
DocType
Annual Town Report
Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Capital Needs Bond improvements(the building is currently not accessible), <br /> The May 2011 ATM approved a $1.5 bond for HVAC replacement (including humidity control),and <br /> completion of capital improvements at various Town <br /> electrical upgrade. After soliciting bids for the project <br /> buildings. The specific improvements had been <br /> three times in 2012,all of which exceeded the available <br /> funds,a decision was made to proceed with the project <br /> identified through an assessment completed by a <br /> consultant hired by the Town. The consultant evaluated using DPW labor to complete the work. Work on the <br /> five buildings including the Town Hall, Archives, project began in late summer 2013. Completion is <br /> Police Station, K.C. Coombs School, and Quashnet expected in time for the building to re-open in May <br /> School and developed a maintenance/capital 2014. <br /> improvement plan for the buildings,with priorities and For other building-related projects,please refer to <br /> cost estimates. The evaluation assessed the condition the DPW and Energy Committee annual reports. <br /> of the building envelope(roof,windows,exterior walls) <br /> and the building systems(HVAC,electrical,plumbing). Respectfully Submitted, <br /> Through this bond,coordination with Cape Light <br /> Steven Cook, Chairman <br /> Compact(CLC)of the final design/engineering for the Irving Goldberg, Vice-Chair <br /> HVAC improvements at the Police Station, including David Bloomfield <br /> Joseph <br /> replacement of the cooling tower, replacement of margon <br /> ma <br /> several air handler units, and upgrade of the energy Eugene S <br /> management system, was completed. Through this <br /> coordination, CLC funded 100% of the installation of <br /> the energy management system. Additional funding Report of the <br /> will be received for other project components. All Planning Board <br /> work will be completed in Spring 2014. <br /> Another project included in the capital bond for To the Honorable Board of Selectmen and the <br /> completion over the next several years was design and Citizens of the Town of Mashpee: <br /> construction of new HVAC system/window system at <br /> the Quashnet School. An application to the On behalf of the members of the Planning Board, <br /> Massachusetts School Building Authority for a grant it is my distinct honor to submit our report for the <br /> to assist with the expected multi-million dollar calendar year 2013. The sitting members of the Board <br /> construction costs was denied. The Town is exploring as of January 1, 2013, were the Chair Mary Elaine <br /> other grant opportunities. Waygan, George Petersen as Vice-Chair, and David <br /> Kooharian as Clerk, Dennis Balzarini, and Joseph <br /> Green Communities Grant Mullin. At the May 2013 election, George Petersen <br /> Through Mashpee's designation as a Green and David Kooharian were re-elected to serve a 3-year <br /> Community, the Town received grant monies for term. <br /> implementation of energy efficiency projects. In At the Planning Board's joint meeting with the <br /> CY13, a small grant was received for insulation and Board of Selectmen on February 25, 2013, Joseph <br /> lighting improvements at Town Hall, KC Coombs <br /> School, and the Middle/High School. These Cummings was appointed Associate Member for the <br /> Planning Board. <br /> improvements were completed in Spring 2013. <br /> Archives Following the May 2013 election, the Board re- <br /> organized electing George Petersen as Chairman,Mary <br /> The May 2011 ATM approved funding through Elaine Waygan as Vice-Chair,and David Kooharian as <br /> the Community Preservation Act for renovation of the Clerk. Dennis Balzarini serves as the Board's <br /> Archives at 13 Great Neck Road North. This building representative on the Historic District Commission. <br /> houses the documents, maps, photographs, artifacts, David Kooharian represents the Board on the Design <br /> and other items important to the Town's history. The Review Committee. George Petersen represents the <br /> work proposed for the renovation include accessibility Board on the Environmental Oversight Committee. <br /> Mary Elaine Waygan represents the Board on the <br /> 106 <br />
The URL can be used to link to this page
Your browser does not support the video tag.