Laserfiche WebLink
FIR <br /> 1 <br /> Report of the <br /> Department of Public Works <br /> To the Honorable Board of Selectmen and the <br /> Citizens of the Town of Mashpee: n <br /> In 2013, the Department of Public Works <br /> performed its normal operations for maintaining the <br /> town roads, buildings, and properties including <br /> Heritage Park,South Cape Beach,the Transfer Station, <br /> and the cemeteries. <br /> Below are highlights of several specific activities The Tiger Long Playground at Heritage Park was <br /> during the past year. upgraded. The project included installation of new <br /> surfacing that is 100%accessible as well as installation <br /> Road Projects of new play structures. A shade structure was also <br /> Construction associated with conversion of the erected adjacent to the playground. Construction of a <br /> following private roads to public roads was completed: splash pad began and will be completed in Spring 2014. <br /> Timberland Shores (Hemlock Drive, Beechwood The project was funded through the Community <br /> Drive,Attaquin Street,Hornbeam Lane,Lantern Lane, Preservation Act. <br /> Pocknomett Street, Autumn Drive, Elm Lane, Holly <br /> Way, Fir Court); Quail Hollow Road; Shorewood Funding for renovation of the Community Park <br /> Drive; Sarakumitt Village (Park Place, Burning Bush, and Veterans Garden, located on Collins Lane across <br /> Scenic, Wood Haul, Noisy Hole); Sandy Fox Dr and from Town Hall, was approved at the May Town <br /> Fox Hill Rd; Ockway Bay Road; Pleasant Park Drive; Meeting. The project is currently under design and will <br /> Santuit Woods(Shields Road,Lyn Court,Tricia Lane, include a pavilion, lighting, and walking paths for use <br /> Michele Lane,Tobisset Street,Pequot Road and Court, by the Town and others for special events. <br /> Nobska Road). Construction will begin in Summer 2014 and is also <br /> funded through the Community Preservation Act. <br /> Construction associated with re-construction of <br /> Great Neck Road North was completed. The project Two additional projects were approved at the <br /> included re-alignment of several intersections, October Town Meeting with funding through the <br /> installation of a traffic signal at Lowell Road, Community Preservation Act. The first is improvement <br /> installation of drainage,and construction of a sidewalk of the facilities at John's Pond Beach. The <br /> along the west side in addition to reconstruction of the improvements will include construction of a new <br /> road itself. This project was funded through Chapter parking lot, bathhouse/picnic pavilion, and a <br /> 90. playground. The second project is improvement of the <br /> facilities at Great River Boat Ramp. These <br /> Special Projects improvements will include replacement/expansion of <br /> the parking lot, installation of a new ramp, and <br /> Reconstruction of the Santuit Pond Dam and fish construction of an accessible dock/float system. Both <br /> ladder was completed. The project brought the earthen projects will be completed in 2014. <br /> dam into compliance with current state and federal <br /> standards and improved fish passage over the dam. The Building Projects <br /> new pool and weir style fish ladder was designed to <br /> accommodate not only River Herring returning to the At Town Hall, DPW, Police, Fire, and the three <br /> pond to spawn but also American Eel. The work was schools, the exterior lighting was replaced with LED <br /> funded through the Cape Cod Water Resource fixtures (both building lights and parking lot lights). <br /> Restoration Project(CCWRRP)as well as the Towns of The LED fixtures use significantly less electricity than <br /> Mashpee and Barnstable who share ownership of the the existing lights, resulting in an energy and cost <br /> property. savings. The projects were funded 100%through Cape <br /> 112 <br />