Laserfiche WebLink
! t" <br /> In Popponesset Bay a sand delta formed over the Members of the Commission volunteer to work <br /> h within <br /> on various subjects/committees bot as well a <, <br /> years and started its drift toward Cotuit Meadows. The � / s i 1 <br /> result was the channel known as the 1916 Channel outside the Commission. Some examples are as r <br /> (originally dredged in 1916)became very shallow and follows: <br /> required a maintenance dredge. The most recent <br /> maintenance dredge was performed in 1936 so we had Barnstable County Coastal Resources Committee <br /> to find documentation of that project in the State Public Access Committee I t <br /> Archives. We found a copy of the dredge contract, Sewer Commission Planning Committee f <br /> issued by the State, which enabled us to get a Mashpee Local Multiple Hazard <br /> maintenance dredge permit from the COE (Corps of Community Planning Team ; <br /> Engineers)for this much needed dredge project. That Barnstable County Dredge Advisory Committee <br /> project was completed with a long haul dredge in Fiscal Mashpee-Wakeby Lake Management Committee , <br /> 2010. The sediment was pumped to the Spit. A follow <br /> i up maintenance dredge was performed in December of Respectfully submitted, <br /> I 2012. The timing of this effort was such that the Kenneth Bates, Chairman <br /> Barnstable County Dredge was in place and set to Steve Pinard, Vice Chairman <br /> dredge but storm"Sandy"and the follow on nor'easters Al Wickel, Secretary <br /> delayed our start until the weather cleared. The Spit, Tim Leedham <br /> after these storms, was in poor shape but after we Donald MacDonald <br /> deposited our sediment on the Spit and Save The Bay William Taylor <br /> maintenance dredged washover sediment from the Paul Zammito <br /> Creek and placed their sediment on the Spit it appears <br /> to be stabilized. <br /> Report of the !, <br /> IMPROVEMENT DREDGING <br /> Zoning Board of Appeals <br /> We resumed work on the engineering portion of <br /> an improvement dredge of the Mashpee River Entrance <br /> and River. This effort has been underway for a number To the Honorable Board of Selectmen and <br /> of years and the disposal process of the sediment has the Citizens of the Town of Mashpee: <br /> been the Towns major hurdle. Our efforts to get this <br /> done should improve the flushing effects of tidal The Zoning Board of Appeals is appointed by the <br /> changes on the River. Selectmen and acts under the authority of I <br /> Massachusetts General Laws (M.G.L.) Chapters 40A <br /> Since finding a location for sediment disposal is and 40B and the Town Zoning By-laws. The Zoning <br /> proving to be very difficult for Mashpee and all Cape Board of Appeals has the following powers: <br /> Towns,it should be noted that with the dredging of the <br /> 1916 Channel in the Bay the flushing of Popponesset To hear and decide Appeals in accordance with <br /> Bay has improved. The Water Quality test data from M.G.L. Chapter 40A §8. j <br /> the summer of 2011 showed a slight improvement in • To hear and decide Petitions for Special Permits 1 <br /> the southern part of the Bay. It appears the clarity of in accordance with M.G.L. Chapter 40A§9. <br /> water in the Bay has improved and hopefully future test <br /> results will support that visible opinion. To hear and decide Petitions for Variances as set <br /> forth in M.G.L. Chapter 40A §10. <br /> OTHER COMMITTEE WORK • To hear and decide Appeals of a <br /> The Waterways Commission is working with the Decision/Opinion of the Building Commissioner <br /> engineering firm of BSC Group to complete our filing in accordance with M.G.L. Chapter 40A §§13 <br /> i <br /> for a comprehensive dredging permit that will and 14. <br /> encompass our three existing dredging permits. This To hear and decide Petitions for Comprehensive <br /> work should be completed sometime in fiscal 2014. Permits under M.G.L. Chapter 40B. <br /> 148 <br />