My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-Annual Town Report
>
2003-Annual Town Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2021 4:15:42 PM
Creation date
2/19/2021 4:15:42 PM
Metadata
Fields
Template:
Annual_Town_Report
DocType
Annual Town Report
Year
2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
patron to notify him when the requested item has Barrett, Vice Chair of the Committee is now the <br /> arrived and is ready for pickup. interim chairperson.The Committee,Library Board of <br /> Trustees and library staff would like to thank Kevin for <br /> Clams libraries agreed to standardize a number the many hours he devoted to the building project. <br /> of policies such as loan periods and overdue fines. <br /> Now patrons can go to any CLAMS library and know The Committee made a presentation about the <br /> that all books are due back in two weeks and all videos building project to the Board of Selectmen in July.The <br /> or DVDs are due back in one week. Previously, each Board of Selectmen raised a number of concerns about <br /> library set its own time limits and patrons had a vari- the size of the building and affordability of the project. <br /> ety of due dates for the same types of materials to keep The committee listened to their concerns and worked <br /> track of. Standardizing each library's policies has with architect, Stewart Roberts, to address these prob- I <br /> made it much less confusing to the patrons. lems. The Committee was able to tighten the building <br /> up by making some areas multi-functional and <br /> The library added new collections of books on selected more affordable construction materials and <br /> CD and DVDs in 2002 and has continued to expand finishes. This resulted in a building size reduction of <br /> these collections by adding new titles. Finding room about 3,000 square feet and a cost reduction of about <br /> for two new collections has been difficult because of $1,000,000. <br /> the building's size limitations. We've "done some <br /> weeding and rearrangement of existing collections to The Committee anticipates bringing an article <br /> make room and to buy some time until a new library is before Town Meeting in May 2004 for the funds to <br /> f built. Moving other collections to new locations had design and construct a new library. A Capital <br /> the added benefit of making it easier for patrons to find Campaign to raise funds is in progress to supplement <br /> some items, like Biographies and the Cape Cod what the voters will be asked to bond. <br /> Collection. <br /> Respectfully submitted, <br /> The Building Committee continues to work on <br /> the Library Building Project. Kevin Connolly, the for Helene B. DeFoe j <br /> Library Director <br /> mer chairman, resigned from the committee in � <br /> September, after several years of service. Bonnie <br /> ,i <br /> _ _ <br /> f� F6 <br /> S (µ <br /> 1 $g <br /> V , # <br /> t ' <br /> e <br /> 115 <br />
The URL can be used to link to this page
Your browser does not support the video tag.