Laserfiche WebLink
I - - — - E_ I W <br /> The relocated, reconstructed Little League Field Approximately 2,000 tons of materials were col- <br /> lected at the Transfer Station for recycling (general <br /> was completed at Heritage Park. The field has a clay <br /> 1 infield, sod outfield and an orientation that is an recycling, yard waste, and bulky waste only). This <br /> accepted standard. represents a 13% increase over 2002. <br /> r The road conversion of Echo Road off Route 130 Below is a list of some of the materials collected <br /> started in April.The existing pavement was pulverized at the Transfer Station with a comparison of the quan- <br /> and mixed with 2000 tons of 3/4 inch dense blend tities collected in 2003 versus 2002. <br />_ stone.Drainage was installed with two courses of two- <br /> inch binder and 1 1/2 inch of top. The 2600- foot long 2003 2002 <br /> road was completed with a total cost of$181,140.44. Newspaper 272 tons 319 tons <br /> Cardboard 123 tons 116 tons <br /> The Attaquin Park parking lot was repaved with Magazines 43 tons 11 tons <br /> leveler and top. Additional drainage was also added. paper/Junk Mail 9 tons - <br /> In June, the traffic signal on Route 28 and Chipboard 6 tons - <br /> Donna's Lane began operations. This is the only traf- Scrap Metal/Appliances 353 tons 335 tons <br /> Glass 74 tons 79 tons <br /> frc signal in Town operated by the Massachusetts plastic 25 tons 17 tons <br /> Highway Department. Cans 15 tons 13 tons <br /> The top course of pavement to complete the Fire Yard Waste 1,000 tons 760 tons <br /> Department reconstruction was provided in July. Tires 686 tires 586 tires <br /> Used Oil 2,500 gallons 2,500 gallons <br /> In August, a public hearing was held by Rep. Car Batteries 405 batteries 287 batteries <br /> Matt Patrick in support of the Commonwealth provid- Fluorescent Bulbs 2,966 feet - ! <br /> ing a traffic signal at the intersection of Route 28 and Electronics/CRTs 36 tons 30 tons <br /> Orchard Road. A follow up meeting was held with Propane Tanks 1,071 tanks 1,389 tanks <br /> Mass Highway officials. A new signal is likely more <br /> than a year away. The Massachusetts Highway The DPW continues to offer free recycling bins <br /> Department wants the design and construction to be to residents at the DPW garage at 350 Meetinghouse <br /> provided with private funds, they will not use MHD Road as well as a free mercury fever thermometer <br /> funds. exchange. Over 150 mercury thermometers have been <br /> exchanged for digital thermometers since the pro- <br /> Pimlico Pond Road was resurfaced from gram's inception. <br /> Preakness Lane to Cotuit Road (5000 ft.) We used 1 I` <br /> 1/2 inch of leveler and 1 1/2 inch of top along with In 2003,the Board of Selectmen approved sever- P <br /> thermoplastic lines. al fee increases for disposal of certain items including ". <br /> tires, televisions, and furniture. These increases were <br /> During the fall, Cotuit Road was cold- planed 1 <br /> 1/2- 2 1/2 inches for the full length (9700 ft.), and necessary due to the increased costs associated with <br /> recycling and disposal of the items. The new fees <br /> paved with 13/4 inches of binder and 1 1/2 inch of top. <br /> This was the primary project using Chapter 90 funds. were effective January 1, 2004. <br /> Most of the road conversion of Holland Mill In addition, the Board approved an increase in <br /> ,j <br /> estates was completed during 2003. the permit fee for FY05 from $55 to $70. This is the <br /> first increase since FY00. Since that time, the trans- <br /> South Cape Beach received over 2000 tons of portation and tipping fees alone for disposal of MSW <br /> beach nourishment sand during the fall. A large por- have increased over 50%. <br /> tion of this material was lost during early winter <br /> s storms. Cemetery <br /> Improvements at Great Neck Woods Cemetery <br /> continued in 2003. The sign at the entrance was added <br /> Imnsfer Station in the spring and new walkways were constructed this <br /> 1 In 2003, the Town of Mashpee generated 9,502 past summer by the DPW. Further improvements are <br /> tons of Municipal Solid Waste .MSW Of this total, <br /> Waste (MSW). planned for 2004 at this cemetery as well as the small, <br /> 4,799 tons were collected at the Transfer Station and inactive cemeteries scattered throughout Mashpee. j <br /> 4,703 tons were collected by private haulers from <br /> commercial properties and from residential curbside In 2003,twenty-five(25)plots were sold at Great l <br /> pickup. <br /> Neck Woods Cemetery. Since the cemetery's opening <br /> 129 <br />