My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-Annual Town Report
>
2004-Annual Town Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2021 4:16:33 PM
Creation date
2/19/2021 4:16:32 PM
Metadata
Fields
Template:
Annual_Town_Report
DocType
Annual Town Report
Year
2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
dredging approach, and that is expensive if commer- <br /> Report of the cial operators are used. We are therefore working with <br /> Waterways Commission the County Dredge department and the other Cape <br /> towns to see if such a capability would be appropriate <br /> for the County. <br /> To the Honorable Board of Selectmen <br /> and the Citizens of the Town of Mashpee This recommendation was documented in a letter <br /> to Selectmen in July 2004, but responses from other <br /> The Waterways Commission meets monthly to Cape towns have been very slow. <br /> deliberate on waterways-related topics. Our goal is to <br /> maintain and improve the waterways in Mashpee. To Water Quality Monitoring <br /> this end we work with the Harbormaster to oversee <br /> n <br /> maintenance dredging and plan and manage improve- who is analyzing We continued working <br /> nutrient with Dr. Brian Howes <br /> roblems of the <br /> ment dredging. We also actively support the Towns Popponesset Ba and Wa uoit Ba Systems. In 2004 <br /> efforts to improve water quality in our bays. pP Y q Y Y <br /> we took samples at 15 sites in Waquoit Bay and its <br /> Maintenance Dredging tributaries <br /> In 2004 we used the County Dredge's booster We took water samples to measure dissolved <br /> pump capability to dredge the outside channel of oxygen, salinity, temperature, turbidity, and nutrient <br /> Popponesset Bay. That enabled us to place over 5000 levels. <br /> r <br /> cubic yards of material onto the southwest end of <br /> Popponesset Spit. We used the material to restore the This monitoring will be an on-going requirement <br /> eroding coastal bank and the County Dredge operator for the indefinite future. Water quality monitoring in <br /> both bas is needed to assess continuing degradation <br /> �. <br /> graded the material to form a wide beach. We also Y g gT <br /> built up the low spot near the tip of Popponesset and eventually determine what effect wastewater man- <br /> Island. agement efforts are having on water quality. <br /> i <br /> The purpose of this beach nourishment effort is Other Committee Work <br /> to maintain the spit's function as a barrier spit that pro- <br /> I <br /> tects the bay from storm action. The effort was suc- The Waterways Commission members partici- <br /> cessful because for the first time in several years, the pate in other Town and County committees as follows: Ij <br /> sand under the stairs at the end of Wading Place Road y <br /> on State land was not washed away.In the past the bot- • <br /> on J.Daly—Barnstable County Coastal <br /> tom of the stairs has been suspended one to two feet in Resources Committee <br /> the air. Also, there were fewer overwash incidents • <br /> James P. Hanks—County Dredge Advisory <br /> during storm activity than in previous years. Committee <br /> • Timothy Leedham — Mashpee Local <br /> Improvement Dredging Multiple Hazard Community Planning <br /> Team <br /> • <br /> It <br /> The current project is to obtain permits to dredge The W. Lumsden — Sewer Commission <br /> the Mashpee River. In mid 2002 we determined that Advisory Committee <br /> the proposed Ockway Bay public landing de-watering • <br /> John Swartzbaugh — Town of Mashpee <br /> site was too small. We investigated the possible use of Wind Energy Task Force <br /> conservation land, working closely with the William R. Taylor — County Dredge <br /> Conservation Commission Chairman and Vice-chair- Advisory Committee <br /> man to arrive at an agreed upon site, but found that it Mashpee-Wakeby Lake Management <br /> was an impractical approach due to the constraints on Committee <br /> use of conservation land. <br /> Respectfully submitted, <br /> Additionally, hydrodynamic and water quality John Swartzbaugh, Chairman <br /> modeling conducted by the Estuaries project revealed James P. Hanks, Vice-Chairman <br /> that removingthe material from the river would have a <br /> Gerald J. Daly <br /> slight negative impact on water quality. Given that, Timothy Leedham <br /> and the lack of a suitable upland site, the best recourse Paul W. Lumsden <br /> appears to be depositing the material in the river in the William R. Taylor <br /> form of islands. To do that requires a mechanical <br /> i <br /> (i <br /> 129 <br />
The URL can be used to link to this page
Your browser does not support the video tag.