My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-Annual Town Report
>
2004-Annual Town Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2021 4:16:33 PM
Creation date
2/19/2021 4:16:32 PM
Metadata
Fields
Template:
Annual_Town_Report
DocType
Annual Town Report
Year
2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
and Legal Tools (the "Tools" report), demonstration <br /> Report of the grants to individual towns for a variety of wastewater <br /> Sewer Commission planning projects and funding of a County contract <br /> with the U. S. Geological Survey (USGS) to provide <br /> the towns with computerized groundwater modeling <br /> To the Honorable Board of Selectmen of potential wastewater discharge sites. <br /> and the Citizens of the Town of Mashpee <br /> Your Sewer Commission has been very aggres- <br /> During 2004, the Commission continued work- sive in obtaining services provided through the WIC. <br /> ing toward developing a solution to the Town's waste- The chairman sat on the subcommittee which selected <br /> water and nitrogen loading problems. The the Tools report consultant and defined the project's <br /> ` Commission's Watershed Nitrogen Management Plan scope of work, and was able to have Mashpee included <br /> /Effluent Pipeline Preliminary Design is intended to as a case study for the project, focusing on the issues <br /> identify the most cost-effective approach to reducing involved in potential municipal acquisition of private <br /> nitrogen in each watershed to levels that do not harm wastewater collection and treatment systems. <br /> the bays. The engineering firm of Stearns & Wheler, Mashpee has more of these than any other town on the <br /> along with Dr. Brian Howes of the UMass-Dartmouth Cape, and some are likely to serve as important ele- <br /> School of Marine Science & Technology (SMaST), ments of future Town facilities. <br /> were contracted to complete the project. <br /> We also secured $33,000 under the WIC's <br /> Until late in the year, our project was stalled by Demonstration Grant program to have Stearns & <br /> delays in the Commonwealth's Massachusetts Wheler develop a plan for wastewater collection sys- <br /> Estuaries Program (MEP), under which SMaST has tems in the Popponesset Bay watershed using <br /> been contracted to do modeling of nitrogen loading SewerCAD computer modeling. This work will serve <br /> and pathways, and to establish nitrogen loading tar- as a direct input to our Watershed Nitrogen <br /> gets, for all estuaries in southeastern Massachusetts. Management Plan. <br /> The MEP report for the Popponesset Bay watershed <br /> was finally delivered in September, with the Quashnet The Commission has also taken advantage of the <br /> River/Hamblin's Pond/Jehu Pond watershed report groundwater modeling contract with USGS. Potential <br /> promised by the end of the year. The reports' nitrogen Town-owned and other sites were reviewed for dis- j! <br /> targets are to be submitted for approval to the U.S charge of treated wastewater. Seven were selected, <br /> Environmental Protection Agency as "TMDLs" (Total which will be modeled to determine how much dis- <br /> char e capacity is feasible where the water will o <br /> Maximum Daily Loads) for our watersheds and must g p y g <br /> be used in developing the mitigation measures to be and what potential impacts discharge could have. This <br /> recommended by Stearns & Wheler. While waiting work will also be directly input to our Watershed <br /> for the state studies, our 0% State SRF loan lapsed, Nitrogen Management Plan. <br /> although we have been assured that it will be renewed <br /> when we reapply at the beginning of 2005. Once the Popponesset Bay was also chosen as one of three <br /> loan is renewed, we will be able to re-start the estuaries for which the Mass. Department of <br /> Watershed Nitrogen Management Plan project. Environmental Protection (DEP) has been funded by <br /> EPA to conduct a "Pilot Project" to study a variety of <br /> Meanwhile, the Commission and our consultants regulatory and implementation issues in response to <br /> have not been idle. The Chairman sits as the Town's the MEP project and the forthcoming TMDLs, includ- j <br /> representative on the Barnstable County Wastewater in "watershed-wide permitting" and "nutrient trad- <br /> Implementation Committee (WIC), which serves as a ing". The chairman sits on the Pilot Project commit- <br /> forum for sharing information, funding local planning tee as well as on DEP's MEP Implementation <br /> studies and participating in the development of a Committee. <br /> regional wastewater strategy. The Committee was <br /> very active this year and obtained County funding for We were also very active in review of the MEP <br /> Popponesset report, and plan to thoroughly review the <br /> a variety of wastewater planning and management pro- <br /> Quashnet / Hamblin's / Jehu Pond report when it is <br /> jects. These included County Health Department <br /> monitoring of on-site enhanced wastewater treatment released, as these reports and their nitrogen loading <br /> targets will be the basis for the Watershed Nitrogen <br /> systems throughout the Cape, including Mashpee, in <br /> cooperation with local Boards of Health, a major con- Management Plan, which, after years of waiting, we <br /> will now be able to fully undertake during 2005. <br /> sultant report entitled Enhancing Wastewater <br /> Management on Cape Cod: Planning, Administrative <br /> 137 <br />
The URL can be used to link to this page
Your browser does not support the video tag.