My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-Annual Town Report
>
2005-Annual Town Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2021 4:17:26 PM
Creation date
2/19/2021 4:17:25 PM
Metadata
Fields
Template:
Annual_Town_Report
DocType
Annual Town Report
Year
2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
their reading log each week, receive a stamp on their square feet in the present building. While all services <br /> log sheet and collect a small prize. Several performers will benefit from the new building, the public will see <br /> appeared at the library during the series to encourage major improvements in Children's Services, Young l <br /> the children to use their reading skills. Adult Services and community meeting space. A <br /> schematic of the proposed building is currently on dis- <br /> On July 7th, Library Director Helene DeFoe and play at the library. <br /> Library Building Committee Chairman Sheldon <br /> Gilbert learned the outcome of the library's applica- During construction, the library will move to <br /> tion for state funding for the new Mashpee Public temporary quarters at a yet-to-be-determined location. <br /> Library. On a prioritized list of 41 communities, In preparation for the move, library staff has been <br /> Mashpee placed twelfth overall. Seven communities weeding the collection of any out-dated materials. <br /> received provisional grants immediately and the This is a cost savings measure so no dead wood will be <br /> remaining communities were placed on a waiting list moved or put into storage. Purging these items prior ` <br /> pending additional bonding authorization from the to the move will help make the moving process <br /> state. Mashpee is currently fifth on this ranked list, smoother and more cost effective.In the meantime,the <br /> and receiving the highest ranking of several Cape and public will have a more attractive and current collec- <br /> Island towns. Previously, Mashpee voters authorized tion. The Trustees look forward to beginning con- <br /> the town to borrow $3,500,000 towards the construc- struction in FY 2007, once the entire funding package <br /> tion of the new library. The state grant will provide an has been secured. ,': <br /> additional $2,500,000 in construction funds. These <br /> two sources provide about 75% of the necessary fund- The library staff made several customer service <br /> ing. The Friends of Mashpee Library are conducting a improvements this year. Bridget Bontrager,Technical � <br /> Capital Campaign to raise the last 25% of the neces- Services Librarian began using the Acquisitions mod- <br /> Capital <br /> funding. Eastern Bank of the South Shore kicked ule of the CLAMS Millennium software this past sum- <br /> off the Capital Campaign with a very generous dona- mer. Acquisitions provides patrons with information <br /> tion of$25,000 for the building fund. Other fund rais- about items that have been ordered for the library col- <br /> ing activities included the annual Artisan's Fair, a lection but have not yet been received. Using <br /> family event called Walk to Read and the collection Acquisitions alerts patrons to what items the library <br /> of pledges supporting Friends President Ted has ordered and allows them to place requests on new <br /> Nadolny's run in the Falmouth Road Race. heavily advertised Best Sellers before they are actually <br /> received. Patrons looking up these items will see an <br /> The new library will be designed by architects J on order status in the catalog record. Since Bridget <br /> Stewart Roberts Associates of Sommerville, creates the catalog record at the same time she places <br /> Massachusetts. The library will be built on the same the order, final processing is much faster when the <br /> site as the present library. The new library will be library actually receives the order <br /> about 22,000 square feet in comparison to the 5,000 <br /> "Km <br /> 167 <br />
The URL can be used to link to this page
Your browser does not support the video tag.