My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-Annual Town Report
>
2005-Annual Town Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2021 4:17:26 PM
Creation date
2/19/2021 4:17:25 PM
Metadata
Fields
Template:
Annual_Town_Report
DocType
Annual Town Report
Year
2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
♦ Construction of piers, ramps and floats. Meetings of the Zoning Board of Appeals are <br /> ♦ Commercial development of property. held on the second and fourth Wednesdays of each <br /> ♦ Extension, alteration or change of a non- month at 7:00 p.m. at the Town Hall. These meetings l <br /> conforming structure. are open to the public. <br /> ♦ Demolition of an existing structure (to <br /> allow for rebuild) Respectfully submitted, <br /> ♦ Conversion of an existing dwelling to Robert G. Nelson, Chairman <br /> accommodate an in-law apartment Zella E. Elizenberry, Clerk <br /> ♦ Development within the Groundwater Marshall A. Brem, Board Member <br /> Protection District. Frederick R. Borgeson, Alternate Member <br /> Evano L. Cunha Alternate Membe <br /> 3. To hear and decide Petitions for Variances as Jonathan D. Furbush,Alternate Member <br /> set forth in Chapter 40A Section 10. The Board Eric Dublirer, Alternate Member <br /> may grant Variance relief from the following: Lori A. Corsi, Office Manager <br /> ♦ Setback requirements. <br /> ♦ Frontage requirements. Report of the <br /> ♦ Land space requirements. Shellfish Department <br /> The Board may grant a Variance only if it , <br /> finds that the following three "Required To the Honorable Board of Selectmen and the <br /> Findings"have been found in the affirmative: Citizens of the Town of Mashpee A <br /> ♦ That there are circumstances relating to The new oyster propagation project has success- <br /> the soil conditions, shape or topographyfully reestablished an oyster fishery in Mashpee. In <br /> which affects the subject lot and not the December 2005,the Board of Selectmen voted to open h '� <br /> Mashpee waters for the harvest of oysters starting <br /> district in which it is located. January 1, 2006. Oysters have not been harvested in <br /> ♦ That a literal enforcement of the By-laws Mashpee since the 1980s. Oyster diseases killed off <br /> would involve substantial hardship to the <br /> the wild oysters, and propagation efforts were unsuc- <br /> Petitioner. cessful at that time.We are now successful because we <br /> ♦ That desirable relief may be granted with- are using disease-free oyster spat from a hatchery, and <br /> out substantial detriment to the public growing them in the Mashpee River where the low <br /> good and without nullifying or substan- salinity water eliminates most predators and oyster <br /> tially derogating from the intent or pur- diseases. The "remote set" system uses very small <br /> pose of the By-law. oyster spat(< 1 mm) that is set on shells in mesh bags <br /> in the hatchery. From there, we transported 200 spat <br /> 4. To hear and decide appeals of a Decision of bags to the Mashpee River in June 2004. More than <br /> the Building Commissioner in accordance 100,000 harvest size oysters grew from that spat. <br /> with Chapter 40A Sections 13 and 14. They were moved to the area around Mashpee Neck <br /> The Zoning Board of Appeals heard a total of Landing for harvest. Oysters feed by filtering algae <br /> that grow on the nitrogen and other nutrients. When h <br /> 135 petitions in calendar year 2005. Petitions and people harvest the oysters, they will be removing <br /> abutter fees in the amount of $14,125.00 were col- nitrogen and helping to reduce the impacts of excess <br /> lected in 2005. nutrients on the estuary. The project was funded by <br /> The Zoning Board of Appeals thanks the other Barnstable County and the DMF. We got another 380 <br /> spat bags in the summer of 2005 and more are funded <br /> Town Boards, Departments, Commissions and Agents <br /> for their outstanding cooperation. The Board wel- for next year. The eventual goal is to grow and harvest <br /> enough oysters to remove at least 500 kilograms of <br /> comes the new Chairman, Robert G. Nelson and <br /> wnitrogen every year. This would be 10% of the 5000 <br /> wishes to thank the out-going Chairman,James Regan <br /> fkilograms of nitrogen reduction target for the Mashpee <br /> or his many years of service to the Town of Mashpee. <br /> River proposed in the Massachusetts Estuaries Project <br /> report on Popponesset Bay (published in 2004). The <br /> i <br /> 169 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.