My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-Annual Town Report
>
2007-Annual Town Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2021 4:19:45 PM
Creation date
2/19/2021 4:19:45 PM
Metadata
Fields
Template:
Annual_Town_Report
DocType
Annual Town Report
Year
2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Library <br /> $eport of the In 2005, the Town applied for a grant from the <br /> Planning & Construction MA Board of Library Commissioners for the con- <br /> committee struction of a new library. The grant was to be used in <br /> combination with $3.5 million already approved by <br /> the Town to construct an approximately 21,000 square <br /> To the Honorable Board of Selectmen and the foot building on the current library site. The applica- <br /> tion was accepted, however, the project was placed on <br /> a "wait list" for funding. In October 2006, with no <br /> definitive date known for receipt of the grant and with <br /> The Planning & Construction Committee was <br /> ` 2005 the escalation of construction costs since 2005, the <br /> appointed by the Board of Selectmen in August <br /> to oversee capital improvements to the Town's facili- Planning & Construction Committee, at the direction <br />� ties as well as the construction of new buildings. In of the Board of Selectman, began review of the <br /> 2007,the Committee,working with the Department of schematic design work completed to date by the prior <br /> I Public Works, oversaw the completion of several cap- <br /> ital projects approved at the October 2005 Town <br /> Meeting, including the replacement of the emergency The Committee spent several months reviewing <br /> generator at the Police Station and the installation of a the library's programming and construction cost esti- <br /> new emergency generator at Town Hall(to be finished mates with the project's architect, R. Stewart Roberts <br /> in February 2008). The Committee also began work Architects of Somerville, MA. The Committee rec- <br /> on two major capital projects, the design construction ommended to the Board of Selectmen that an addi- <br /> of a new fire station and the long-anticipated tional $2 million in funding be approved to supple- <br /> s ment the existing Town and grant funding to build the <br /> design/construction of a new library. <br /> 21,000 square foot library. The additional funding <br /> Fire Station#2 was approved at the May 2007 Annual Town Meeting <br /> and Town Election. In September, the Town received <br /> At the May 2006 Annual Town Meeting and sub- notice of the release of the grant funding. <br /> s Sequent Town Election, $2.1 million was approved by <br /> s the voters for the design and construction of a second The Committee interviewed for an owner's pro- <br /> fire station to be located on Town-owned property at ject manager in November, again, a state law require- <br /> 101 Red Brook Road. In January 2007, an owner's ment. Pomroy Associates was hired in January 2008. <br /> s project manager, Pomro Associates of South Easton, <br /> The Committee will work with the project manager, <br /> C MA,was hired by the Town, as required by state law, architect, and Library Director over the next six <br /> to assist with the project. An architect, Durland, Van months to finalize the plans and specifications. <br /> Vorhis Architects of New Bedford, MA, was hired in During that time, the library will also be moved to <br /> s <br /> May 2007. temporary space. Construction of the new building is <br /> anticipated to begin in Fall 2008. <br /> Working with these two firms and the Fire Chief, <br /> design plans and specifications for an approximately Respectfully Submitted, <br /> 5,100 square foot, single story station were finalized. <br /> The station will include living quarters for up to six Steven Cook, Chairman <br /> Irving Goldberg, Vice-Chair and two apparatus bays. Filed sub-bids <br /> and bids for the general contractor were solicited in Janice Mills, Clerk <br /> October. The Town received an excellent response to Joseph Brait <br /> the Request for Bids. A total of 15 bids for the gen- Sheldon Gilbert <br /> eral contractor were submitted and the bid percentage Kevin tt <br /> Smar <br /> spread for the five low bidders was approximately 2%. Eugene margon <br /> A contract was awarded to the lowest responsive and Patricia Parolski, Ex-Officio <br /> qualified bidder,Barbato Construction of Middleboro, <br /> MA, in December for just over $1.4 million, almost <br /> $2001000 less than estimated. Clearing of the project <br /> site by the Department of Public Works began in <br /> December. Construction is scheduled to begin March <br /> 1,2008. <br /> 131 <br />
The URL can be used to link to this page
Your browser does not support the video tag.