My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-Annual Town Report
>
2009-Annual Town Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2022 11:41:06 AM
Creation date
2/19/2021 4:21:59 PM
Metadata
Fields
Template:
Annual_Town_Report
DocType
Annual Town Report
Year
2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
_.I <br /> i <br /> second consultant, Lombardo Associates, Inc. (Final Report in July 2008), based on <br /> neighborhood "cluster" systems using Septic Tank Effluent Pump (STEP) sewers and "Nitrex" <br /> wastewater treatment technology for smaller clusters or other treatment technologies for larger <br /> clusters (over 100,000 gallons per day). Cost estimates for the cluster scenario were <br /> significantly lower than those for more traditional sewer systems, primarily due to the lower <br /> cost of the STEP sewer collection system. <br /> All of the scenarios were submitted to the UMass-Dartmouth School of Marine Science & <br /> Technology (SMaST) to be tested for their effectiveness in meeting the TMDLs using the MEP <br /> models. The results of the model runs were presented at the Commission's meetings in <br /> November and December 2009. As 2010 begins, the next task for the Commission, our <br /> consultants and our Community Advisory Committee will be to refine the most promising of the <br /> scenarios, or combinations of them, for more detailed development, review and costing. It is <br /> anticipated that 2 or 3 such scenarios will be developed, run through the models and reviewed <br /> for capital and long-term operating costs, management issues and public acceptance before a <br /> final selection is made and a final draft of the Watershed Nitrogen Management Plan is <br /> completed and submitted for required county and state review and approval. It is hoped that, <br /> barring further unforeseen delays, that submission will be made by the end of 2010. ; <br /> It should be noted that the scenarios highlight our need to identify and reserve parcels of land for <br /> sewage pumping stations, treatment plants and discharge areas, as well as the major costs that <br /> will be involved in sewering the town. Mashpee has serious work cut out for it over the next few <br /> years to identify funding and financing strategies and priorities related to developing the <br /> facilities that will be needed to meet the TMDLs and clean up our waterways. As one potential <br /> strategy for dealing with funding and development of sewer facilities in the most cost-effective <br /> way, discussions have been held with the Water District and Selectmen with regard to potential <br /> expansion of the District's role to include sewer facilities. The Town of Dennis and Dennis <br /> Water District have decided on that same approach and have filed legislation to turn the Dennis '"' <br /> Water District into a water and sewer district. To date, no consensus has emerged regarding that <br /> option in Mashpee, which is strongly supported by the Sewer Commission. However, <br /> organizational and financial issues will have to be a key part of work on the final Plan and public j <br /> discussion on its implementation. <br /> In addition to the five scenarios developed by Mashpee, the Town of Falmouth has initiated <br /> discussions about development of a large regional wastewater treatment plant on a site adjacent <br /> to the existing treatment plant on the Massachusetts Military Reservation (MMR), involving <br /> some sort of regional arrangement with Mashpee, Sandwich and Bourne. The Commission has ° <br /> indicated an interest in considering that approach for a portion of our wastewater needs if it f" <br /> becomes feasible and cost-effective for Mashpee. <br /> Our consultants also began work on identifying and testing potential sites for discharging treated <br /> wastewater. There are four primary sites under consideration, in addition to smaller sites <br /> associated with the cluster scenario, as well as existing sites currently used by the Town's eight <br /> private sewer systems. The Selectmen provided their approval of test wells and pits on the three ; <br /> Town-owned sites, located on Ashumet Road, Red Brook Road and adjacent to the Transfer <br /> Station (the fourth is a privately-owned site under the New Seabury Golf Course), but work had . <br /> to be halted when the State Archaeologist demanded an intensive archaeological survey of the <br /> transfer station site and the State Natural Heritage and Endangered Species Program (NHESP) <br /> remapped the site as endangered species habitat. The Commission received an $8000 proposal y <br /> for the archaeological work at the Transfer Station site, but has put the site testing program on <br /> 195 q <br /> E" <br />
The URL can be used to link to this page
Your browser does not support the video tag.