My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/17/2021 SEWER COMMISSION Minutes
>
06/17/2021 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2021 5:01:17 PM
Creation date
8/27/2021 12:38:04 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
06/17/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(but not including Contractor's safety meetings), and as appropriate prepare and <br /> circulate copies of minutes thereof. <br /> 4. Safety Compliance: Comply with Site safety programs, as they apply to RPR, and if <br /> required to do so by such safety programs, receive safety training specifically related to <br /> RPR's own personal safety while at the Site. <br /> 5. Liaison: <br /> a. Serve as Engineer's liaison with Contractor. Working principally through <br /> Contractor's authorized representative or designee, assist in providing information <br /> regarding the provisions and intent of the Construction Contract Documents. <br /> b. Assist Engineer in serving as Owner's liaison with Contractor when Contractor's <br /> operations affect Owner's on-Site operations. <br /> c. Assist in obtaining from Owner additional details or information, when required for <br /> proper execution of the Work. <br /> 6. Clarifications and Interpretations: Receive from Contractor submittal of any matters in <br /> question concerning the requirements of the Construction Contract Documents <br /> (sometimes referred to as requests for information or interpretation—RAS), or relating <br /> to the acceptability of the Work under the Construction Contract Documents. Report to <br /> Engineer regarding such RFls. Report to Engineer when clarifications and interpretations <br /> of the Construction Contract Documents are needed, whether as the result of a <br /> Contractor RFI or otherwise. Transmit Engineer's clarifications, interpretations, and <br /> decisions to Contractor., <br /> 7. Shop Drawings and Samples: <br /> a. Record date of receipt of Samples and Contractor-approved Shop Drawings. <br /> b. Receive Samples that are furnished at the Site by Contractor, and notify Engineer of <br /> availability of Samples for examination. <br /> c. Advise Engineer and Contractor of the commencement of any portion of the Work <br /> requiring a Shop Drawing or Sample submittal, if RPR believes that the submittal <br /> has not been received from Contractor, or has not been approved by Contractor or <br /> Engineer. <br /> 8. Proposed Modifications: Consider and evaluate Contractor's suggestions for <br /> modifications to the Drawings or Specifications, and report such suggestions, together <br /> with RPR's recommendations, if any, to Engineer. Transmit Engineer's response (if any) <br /> to such suggestions to Contractor. <br /> 9. Review of Work;Defective Work: <br /> a. Report to Engineer whenever RPR believes that any part of the Work is defective <br /> under the terms and standards set forth in the Construction Contract Documents, <br /> Exhibit D—Duties,Responsibilities,and Limitations of Authority of Resident Project Representative <br /> E1CDC®E-500,Agreement Between Owner and Engineer for Professional Services. <br /> Copyright©2014 National Society of Professional Engineers,American Council of Engineering Companies, <br /> and American Society of Civil Engineers. All rights reserved. Page 2 <br /> This document has been modified from its original form as an EICDC document and the user did not highlight the modifications. <br /> You are encouraged to read the document carefully and consult Legal Counsel prior to its execution. <br />
The URL can be used to link to this page
Your browser does not support the video tag.