Laserfiche WebLink
air ✓noi;9l .. <br />Yp'� 3.InKCL�P` <br />16 Great Neck Road North <br />Mashpee, %lassachusetts 02649 <br />150ft. long, paved with gravel beneath. He is happy to have the Fire Department come out and inspect. <br />They would request it be a condition of the occupancy permit, as they would like to get going on the lot. <br />Mr. Balzarini asked if it has a turnaround for fire trucks. <br />Mr. McElhinney acknowledged it does not have a turnaround, it is straight and there is a hydrant. It is <br />near Teal Circle. These houses are going to be constructed very close to the common driveway, about <br />50 feet off it. At most 150ft. away from an existing public way. <br />Ms. Waygan said she thinks there needs to be a vote on whether it's a minor modification or not. <br />MOTION: <br />Ms. Waygan would like to make a motion to consider this as a Minor Modification with no <br />additional Public Hearing. Mr. Callahan seconded. All in favor. <br />Ms. Waygan asked if there is a map in her packet. She is looking at lot 37, 38, and lot 19 is the one <br />already constructed. She would like to know how to get to Teal Circle from these two lots. She asked if <br />that is the piece that is 150 ft. <br />Mr. McElhinney stated there is an easement. The easement was created in the early 2000's. The <br />Planning Board never officially approved it as a common driveway even though that was clearly the <br />intent and an oversight on the developers' part. He noted yes, it starts at Teal Circle and ends at lot 37, <br />that's roughly 150 ft. <br />Mr. Lehrer thinks the Board could make a motion to approve, but the comment Mr. Phelan made <br />regarding compliance with the bylaw 174-32 will be a requirement of a building permit. Mr. Phelan's <br />concern is the structure that is 200ft. or more from the nearest roadway needs to be compliant with <br />174-32, meaning it can support fire apparatus. If these houses are 200ft. or more from Teal Circle they <br />would have to be conforming to 174-32. You can approve the use, but it will need to comply with that <br />bylaw. His recommendation is conditional upon an inspection by the consulting engineer at the expense <br />of the applicant. The surface needs to be able to sustain fire apparatus. <br />Mr. McElhinney said this will be used for construction and there will be heavy vehicles and machinery <br />and there is a possibility it will need repair afterwards. He said it makes sense to meet with the Fire <br />Department. <br />Mr. Lehrer stated the applicant requested a waiver for fees. It can either be granted and request the <br />applicant to pay or you don't grant the waiver and we hold a check in escrow and pay the consulting <br />engineer pursuant to his findings. Any funds not used by the Town would be returned to the applicant <br />upon completion of the project. <br />15 <br />