Laserfiche WebLink
)l\ll.V"It � <br /> Board <br /> °7311» Town of�Vl as by e e PCannin <br /> 16 Great Weck Road Worth <br /> Mashpee, .Massachusetts 02649 <br /> Mr. Phelan stated the house would have to be relocated or torn down, it's not staying either way. Based <br /> on the fact the previous Deputy signed off on this, he is all set with his questions. <br /> PUBLIC HEARING —7:15 P.M. <br /> Applicant: Southworth Mashpee Properties LLC (Continued from November 17, 2021) <br /> Location: 178-184 Quinaquisset Avenue (Map 69 Blocks 23-26) <br /> Request: Applicant proposes to modify an approved definitive plan by adding one <br /> additional lot to the previously approved five lot subdivision known as Willow <br /> Circle. <br /> Mr. Fulone is opening up the Public Hearing for 7:15p.m. at 7:22p.m. <br /> Mr. Phelan noted the Select Board adopted the similar street name policy, as it is a policy now, they will <br /> need to look into that name to ensure approval. <br /> Mr. Eddy will confirm the street name approval. He would like to go over Mr. Pesce's comments about <br /> the site. Item one refers to the turning radius and the Fire Department, which was just addressed. The <br /> sidewalk which was a waiver request in 2010, waiver request can be resubmitted as needed. He <br /> apologized for the planting schedule, the landscape tables were reprinted and passed them to <br /> members. <br /> Mr. Pesce wanted to have something he could inspect. He needed to make sure there were 22 trees if <br /> 22 trees are listed. <br /> Mr. Eddy continued with the list and the erosion control plan added. He calls out some erosion control <br /> aspects, need to stabilize construction entrance and add some silt fence. There is a detail reference, <br /> changed to a silt sack from what was shown ten years ago,just needs updating. They can add <br /> additional spot grades along the road, identifies centerline grade, they can add some elevations, it's not <br /> a problem. <br /> Mr. Pesce noted the centerline is there, he is worried what the contractor will do, cross sections should <br /> work. <br /> Mr. Eddy continued with providing necessary seals on final Mylar's for the professional land surveyor <br /> and engineer. Storm water management, drainage areas are small. With the two catch basins, and TSS <br /> removal ran at 90%, even if the catch basins were not there the TSS removals were met. He did submit <br /> TSS calculation to Mr. Pesce. That was the extent of Mr. Pesce's comments and he is happy to answer <br /> any further questions. <br /> Mr. Balzarini inquired about the fire trucks and their width for the island. <br /> Mr. Phelan said the trucks are no wider than 10 feet and requirement is 20 feet. <br /> 3 <br />