Laserfiche WebLink
project which were delivered to the Board at its meetingon <br /> new material, including basic changes in the proposal ad informatril ion This ti <br /> requested at previous meetings, was not submitted in sufficient time to <br /> allow proper review by the Board prior to its having to render a decision <br /> under the statutory time limits of MGL Chapter 41. <br /> 7. Initial comments by the Board's consulting engineer required additional soil <br /> testing, a coordination of the road design plans with the applicant for an <br /> abutting proposed subdivision and other modifications to properly evaluate <br /> the technical aspects of the plan. Although the applicant's engineer met <br /> with the Boards engineer to review these comments, the -revised plans were <br /> not returned to the Board in sufficient time for adequate additional review <br /> before the deadline for a Board decision. <br /> i <br /> ti <br /> t <br /> K , <br /> • f <br /> r <br />