My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/21/2004 PLANNING BOARD Minutes
>
01/21/2004 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 3:48:53 PM
Creation date
1/19/2022 11:51:34 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
01/21/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Formal inspections covered by the basic inspection fees listed above include drainage <br /> inspection, gravel inspection, inspection ofpaving binder course, inspection of paving <br /> finish course and final inspection for roadways In subdivisions and for roadways and <br /> parking areas in special permit projects other than cluster subdivisions, as well as other <br /> site d v lopment, exclusive of buildings, as required by the Planning Board, for special <br /> perrnit projects-. <br /> re-inspection fee will be charged for additional inspections beyond those listed <br /> above that are made necessary due to unsatisfactory materials or construction that lead to <br /> a failure to pass the original inspection. <br /> The filing and review fees specified above shall be submitted to the Board as part of <br /> the original application for any permit. An application will be deemed to be incomplete <br /> without payment of said fees at the time of submittal. <br /> Inspection fees specified above shall be submitted to the board within 20 calendar <br /> days following in the approval of any special permit and or definitive sub li ision plan and <br /> prior to the Board's endorsement of any subdivision plan or special permit decision. <br /> Any re-inspection fees due shall be submitted prior to the release of any roadway <br /> covenant or performance bond for road construction or other facilities covered by a <br /> subdivision or special permit approval. <br />
The URL can be used to link to this page
Your browser does not support the video tag.