Laserfiche WebLink
through the Phase IB area, and that it would be in close <br /> proximity to some of the neighbors. <br /> (References were being 'Made to the sketch not.ini g other <br /> possible locat-ons. <br /> Ir. O' Malley suggested they complete some further <br /> research at which time they could appear before the Board <br /> with their findings . <br /> Mr. O' Malley also spoke to the preservation of the <br /> current structure, use as a bu stop or for storage <br /> purposes . <br /> The Chairman expressed concern regarding safety issues <br /> an- d usage. <br /> Dennis Ba 1 arini reminded the speaker that the <br /> structure was illegally constructed within the buffer zone <br /> and that he would life to take advantage of correcting this <br /> situation. <br /> There being no farther Board discus-sion the Chairman <br /> entertained a motion. <br /> MOTION: Dennis Bal arini -made a Motion to continue <br /> the Public Hearing in this matter to May 19, '00.4 , at 7 : 1 <br /> p.m. ; which Motion was duly seconded by Don Myers and s <br /> voted unanimously. <br /> Approval Not Required Plan <br /> New Seabury Properties LL /BSS Design <br /> Shore Drive West - Assessors' Map 127, Blocks 1, 16, 1.7 <br /> The Chairman determined this matter has been postponed <br /> until June 16, 2004 . <br /> Special Permit <br /> Windchlr e Point, Inc. <br /> i ndch it e Point Condominium - Great Neck Road South <br /> Approval of Phase III Landscape Plans <br /> Buildings 43 and 44 - Phase II sioff <br /> (Wastewater Treatment Plant Issue) <br /> The Chairman recognized Ir. Quinn who informed the <br /> Board that h'e is working with the Asistant Town Planner <br /> 5 <br />