Laserfiche WebLink
Mr. Rowley stated the estimated amount is $2, 912 . 00 <br /> and that an additional amount should be calculated t <br /> reflect the two ( ) bends that have not yet been set. <br /> which- would be approximateiy 4 , 00 . 00 . <br /> MOTION:. Dennis Bal arini made a Motion to release Lot <br /> , with the stipulation that Applicant provide a check in <br /> the amount of $4 , 500 . 00 prior to the actual release of the <br /> lot, and subject to satisfactory ins .ection by the <br /> Consulting Engineer; which Motion was duly seconded by <br /> Steve Dolan and so voted unanimously. <br /> Board signature: Beverly Kane, Dennis Bal arinl, Lee <br /> Gurney, Steve Dolan, and John Halaohis . Release of <br /> Covenant Agreement. <br /> Road Design Approval <br /> onto Management Group- uippish Road. <br /> Planning Board Determination Regarding Design of a <br /> Portion of Quippish Road <br /> The Chairman called this matter- to order and <br /> recognized John O' Connor, Vice President of Couto <br /> Management, who explained his appearance before the Board <br /> Is on behalf of Attorney Michael Ford who was unable to <br /> attend the meeting. Reference was made to letter dated <br /> April 20, 2005, to the attention of the Planning Board, <br /> signed by Attorney Ford, and which. was read into the Record <br /> by the Chairman. <br /> Mr. Rowley explained the Town Planner had asked him to <br /> report on the condition of Quippish Road and to provide an <br /> assessment of the site plan with respect to Quippish Road <br /> as well, to the Board this evening. <br /> Mr. Rowley has also been asked to review the entire <br /> plan on behalf of the Zoning Board of Appeals for their <br /> next meeting. <br /> Ir. Rowley stated he feels the plan is -insufficient in <br /> a number of areas, with respect to detail of existing <br /> conditions and the proposed information for the proposed <br /> reconstruction and widening of Quippish Road. Further <br /> information and evaluation deta.i l is needed on the plan . <br /> The drainage calculations do not include Quippish Road. <br /> Runoff issues must be addressed. <br /> 12 <br />