Laserfiche WebLink
the property. All properties will be connected to the <br /> sewer system. He made reference to the emergence access. <br /> The Town Planner determined an easement document would <br /> have to be filed. He also determined that all frontage <br /> requirements have been net . <br /> There being no further Board comment the Chairman <br /> entertained a motion. <br /> MOTION : Lee Gurney made a Motion to sign the Plan for <br /> New Seaburr Properties LLC, Rock Larding Road and Shore <br /> Drive West, dated May 1 , 25 as Approval. Not Required; <br /> which Motion was duly seconded by Dennis Balarini and so <br /> gated unanimously. <br /> The Notice of Filing was signed by Dennis Balzarin-1. <br /> Approval Not Required <br /> C. Talanian Realtor Company-Commercial Street <br /> Signature of Lot Division Plan Not Requiring <br /> Subdivision Approval <br /> The Chairman called this natter to order and <br /> recognized Don Megathlin. <br /> References were made to a Plan of Land entitled, <br /> "Commercial Street Subdivision and South Cape Village, <br /> Mashpee, MA, prepared for C. Talanian Realty Co. , Inc. <br /> Plan of Lana Defining Proposed Commonwealth Electric <br /> Company Property, J. K. Holmgren Engineering, Inc. , Baxter, <br /> Nye & Holmgren, dated 11 , revised 4/26/05. <br /> Mr. Megathlin explained the Planning Board issue to be <br /> a minor site plan modification involving approximately <br /> .5, o00 s q. ft. He provided background information relating <br /> to the Cape Cod Commission. <br /> Mr. Megathlin made reference to the -Stag easement <br /> and to conditions imposed (all of which are documented <br /> within the Cape Cod Commission DRI Decision) . <br /> -Star has 10-gears in which to build a utility sub- <br /> station to be approved by the Mashpee Planning Board and <br /> the Cape Cod Commission. If not approved, everything <br /> reverts back to the restrictive covenant/C. Talanian <br /> Realty. <br /> 10 <br />