My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/02/2008 PLANNING BOARD Minutes
>
01/02/2008 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2022 5:01:57 PM
Creation date
1/19/2022 3:53:59 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
01/02/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The-Chairrnan called this matter to order, determined that Applicant was not <br /> present, and then deferred to the Consulting Engineer for a report and update on the <br /> conditions. <br /> Mr. Rowley reported that he had made a partial inspection of the property, as well <br /> as a review of the letters on file. The Town Planner provided are excellent summary. The <br /> majority of the items being held under security have been completed. There are some <br /> questions regarding the bounding as they have more than likely been covered by the grass <br /> lawns. The street signs, drainage items, and top paving in several places) have been <br /> completed. There is-some clean-up required, as vcll as verification of the bounds. <br /> Release of Performance Guarantee <br /> Miscellaneous Inspections-Anthony's Way and Spring Dill West <br /> Mr. Rowley reported that he made a satisfactory inspection of Anthony`s Way a <br /> there is also money being held,with regard to this project. <br /> MOTION: Dennis Balzarini made a Motion to release the Performance <br /> Guarantee being held forAnthony's Warr in the.amount of Twenty Eight Hundred <br /> re <br /> ($2800.00) Dollars; which Motion was duly seconded by Thomas O'Hara and so voted <br /> unanimously. <br /> Board Signatures: Beverly Dane, Dennis BaLzarini, Myrna Nuey and Thornas <br /> O'Hara. <br /> Release of Performance Guarantee <br /> Santuit Woods Section C, Pequot Circle Loam and Seed <br /> Mr. Rowley reported that he made a satisfactory inspection of Santuit Woods <br /> from some time ago, which project has long been completed. <br /> MOTION: Dennis Balzarini made a Motion to release the Performance <br /> Guarantee being held for Santuit Woods, Section C, Pequot Circle in the mount o <br /> Twenty Two 1:Iu ndre l-Fifty 2 . Dollars,plus,interest accrued; which Motion was <br /> duly seconded by Thomas OHara and so voted unanim usly. <br /> Board Signatures: Beverly Kane, Dennis al arini, Myrna Duey and Thomas <br /> O'Hara. <br /> Non-Agenda Item <br /> Spring Dill West <br /> Mr. Rowley reported that the emergency access between the-cul-de-sac and Fox <br /> Hill has never been completed and remains woods. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.