My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/19/2000 PLANNING BOARD Minutes
>
01/19/2000 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2022 5:03:30 PM
Creation date
1/20/2022 8:57:40 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
01/19/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
db <br /> Discussion Opened @ 9:05 PM <br /> Applicant: Windchime Point Development Group,Ltd, <br /> Location: Windchime Point,Great Deck Road South <br /> Request: Enlargement of bedrooms,Phase 1 ,knits 30, 35A,35B, 29 <br /> Rescheduled from January 5,2000. <br /> Applicant represented by Stu Bernstein. Each-unit will be a total of 61 ft. larger. <br /> lr.'Bornstein informed the hoard that his permit allows for 178,000 ft., including the 1 <br /> built by someone else. Air. rnstemn presented the board with a new schedule that was <br /> completed by Terror Eldridge (who was too sick to attend the meeting). So far,to date, <br /> ' indchime has constructed or plan to construct(with the larger bedrooms)48,981 ft. <br /> with 116,000 ft. left to construct over about 100 units, at about 5 8000 ft. per fifty units. <br /> Right now they are at about 48 units, not to go over 178, f . One building was <br /> changed from a 4-plex to a - le . fir. Malone asked if there were any changes in <br /> gages. Mr. Bomstein stated that garages are built only as requested. To date, 10 <br /> garages have been.bu31t against an estimate of 15 on the plan). The larger bedrooms are <br /> in buildings 29, 30, 35A and 35B. Mr. Bornstein expects to build fewer buildings than <br /> what was originally planned- Mr. Fudala asked bow much larger each unit will be. lair. <br /> Bornstein stated that each unit will be 61 sq. ft. larger. The hoard voted this change <br /> would not be a modification to the Special ernut. <br /> Motion to approve larger bedrooms buildings 29,30,35A and 35B <br /> Motion to approve building 30 changed from a 4-plex to a -plex <br /> Motion: Dennis BaLzarini Seconded: Matt Malone <br /> Vote: 5-0 Unanimous <br /> Definitive Plan <br /> Applicant: Steve GiatrelisCape& Islands Engineering <br /> Location: Route 130,Asmsors Map 26,Block <br /> Request: Signature of 2-10A Definitive ptan. Rescheduled from January 5,2000. <br /> Covenant brought in at the beginning of the meeting to be signed by the board. <br /> Motion to sign plans <br /> Motion: Matt Malone bonded: Denab Balzarini <br /> Vote: Unanimous <br />
The URL can be used to link to this page
Your browser does not support the video tag.