Laserfiche WebLink
Release of Covenant <br /> Applicant: Willowbend Development Corp. <br /> Location: windy rate Road and Bonnie Blink-Road <br /> Request: Release of Covenant Dated 487. Continued from 4700. <br /> The applicant was represented by Mr. Tom Hardaman. The Planning Department <br /> received a fax from Ilex. Rowley which was presented to the Planning Board, dated <br /> 419101, indicating he thinks the amount requested 1,30,000.00 for the covenant <br /> release is OK This amount, not including the cost of the pump station, worts out to be <br /> $333.00 per linear foot of roadway. i111r. Rowley did recommend that final plans be <br /> presented to the planning Board as soon as possible for review and that a condition o <br /> approval be a revised cost estimate is presented to the Board for review at that time. <br /> Additionally,Mr. Rowley-suggested the board would set a time limit and make its usual <br /> adjustment to the covenant release i.e., 1 0 of the amount requested). Mr. Harda man <br /> had spoken with willow bends' Jack Mclhinney regarding the time issue; they feel a <br /> couple of gears to complete is one. Mr. I ardaman also indicated the-sewer design is <br /> almost complete (with hydrants every oo'). Nor. Fudala feels that updated plans should <br /> be included as the current plans are 1987 with no sewer design included. Mr. Malone <br /> suggested the covenant be 1 %of the amount requested and a -year time limit be <br /> specified. Nix. Hardaffmn will get a covenant signed by the board members(who will <br /> come into the Planning Department office to sign sauce) along with a check for$75. <br /> Motion to Release Covenant @ $1,3 0,000 plus 0%,Impose a 2-Year Time <br /> Limit to Complete, & Submit an Updated Set of Plan to the Planning Board <br /> Motion: Dennis al rm* ]* Seconded: Martine Meiwering <br /> Vote: 3-0 Unanimous <br /> Public Bearing opened @,) 7: o PM <br /> Applicant: Janet& Harry Emmons and John & Sandy Hefler7Cape& blands <br /> Location: 80& 84 Punk horn Point road, Assessors Map 100,Blocks 4 & <br /> Request: Approval of -Lot Definitive flan. Submitted 31110 <br /> The applicants were represented by Dave Sanicki, Cape & Islands Engineering. The <br /> puns are being submitted because-there is a driveway that encroaches on one of the lots. <br /> Plans are submitted because of a technicality which is the Emmons' do not have <br /> sufficient frontage. There is no change in tentage on these particular lots, which do <br /> show on the plan. The applicants entered into an agreement to sell the driveway parcel if <br /> the Emmons' would sell another parcel on the other side of the Hefler property. Cape <br /> 2 <br />