My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/03/1999 PLANNING BOARD Minutes
>
03/03/1999 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2022 5:04:44 PM
Creation date
1/21/2022 9:58:17 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
03/03/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br /> �1 { <br /> ql� <br /> The Town Planner clarified the purpose of the bond to be a = r <br /> 3T: <br /> long term security for the Town in the event the project wasIon <br /> raven to have an adverse impact on the Mash River. I f proven <br /> p Mashpee p <br /> l'` ,; so, the money would be used to upgrade the treatment in the plant,., <br /> and/or whatever steps were deemed necessary to keep the River � . � <br /> from degrading <br /> l�`F"'- •T�'I <br /> r <br /> Applicant requested the Board ye <br /> �modify this required condition <br /> in his favor. <br /> r' <br /> The Town Planner stated there is no time limit connected <br /> A with this condition, "The Applicant shall prior to commencement ` <br /> pP p <br /> p of construction pursuant to this modification, deliver to the <br /> Town of Mashpee a performance bond, in the amount of one Hundred <br /> Twenty-Five Thousand 12 0 0 0 . 0 0 Dollars which bond shall t' <br /> secure Applicant ' s ability to upgrade or improve the wastewater <br /> + <br /> y treatment facility, or in the alternative implement additional ! { <br /> innovative wastewater treatment methods in the event of either ' <br /> s'a•k <br /> a violation of Condition #32 or a determination by the Planning <br /> `h p e treatment facilities resulted in <br /> Board that the operation of the <br /> ro•,�.:.R i f 1 <br /> b? the presence of excessive levels and nutrient concentrations n ��!{ <br /> groundwater or surface water samples as measured by a monitoring <br /> _= program described herein, which excessive levels can be { r <br /> s° - (inaudible) by application of additional upgraded technologies or 'I i <br /> processes reasonably available for this project. " <br /> r. The Town Planner noted the issue of impacts of this project , <br /> on the Mashpee River was of major public concern at the time this + a <br /> ro ect was originallyr 4I <br /> p � proposed. <br /> . <br /> St...aw <br /> �r It was the general consensus of the Board that Applicant <br /> would receive a negative determination with regard to relief of <br /> said requirement. <br /> 3�Y=' i i <br /> It was noted that Applicant s n violation of this <br /> k Condition to his Special Permit and that it should be brought to <br /> p g <br /> the Building Inspector' s attention. ' <br /> s� r r f'• <br /> :h. Applicant stated he would provide the required bond or an <br /> p � <br /> escrow account in the amount of one Hundred Twenty-Five Thousand ; <br /> {$125� 000 . 00) Dollars, as conditioned in the Special Permit as S <br /> P <br /> assurance the treatment plant will not cause environmental r <br /> hazards in the Mashpee River, within a thirty (3 0) day period. `,{ <br /> The T ' this m Town Planner suggested Applicant discuss t s after <br /> with the Town Treasurer regarding the form a security. He '� � <br /> further suggested Applicant draft the bond agreement for Planning <br /> Board approval prior to finalization. The Chairman suggested <br /> Town Counsel review as well. (This matter concluded at 8:55 JI <br /> ru <br /> P.M. ) <br /> Ff <br /> Discussion. <br /> Alfred Schofield -- Stratford Ponds <br /> I <br /> 7_ { p <br /> i <br /> I r <br />
The URL can be used to link to this page
Your browser does not support the video tag.