Laserfiche WebLink
rhn. <br /> 1 <br /> w_ MOTION: Chance Reichel made a Motion to continue the , <br /> Public Hearin in this , <br /> ;r g s matter to Wednesday, April 21, 1999 at <br /> 7, 15 .m. - which Motion q p was seconded by James Dorgan and so <br /> voted unanimously. (This matter concluded at 7: 3 5 , ',{•� <br /> Discussion ` <br /> r` Stuart Bornstein - windchime Point <br /> Potential Design Changes for Buildings <br /> Performance g <br /> $125, 000 . 00 ormance Bond for Treatment Plant <br /> �t 4 <br /> The chairman recognized Applicant, Stuart Bornstein and <br /> Project Manager, Mike Roberts. <br /> NOTE: There were four (4) Members of the Nin.dchime Point <br /> Condominium Association present at this point- Fran Doherty, <br /> Mar <br /> e Harrington, y � <br /> g a ington, Paul Kelleher, and Mary Scanlan, Art Traczyk <br /> arrived later into the Meeting. <br /> - reference e re <br /> The Chairman made <br /> to letter received from Arthur ` <br /> P. Traczyk, Planner & Landscape Architect dated March� l7 1999 � <br /> which letter is attached hereto as a part this r ' <br /> p s ,��• <br /> Basically, Mr. Traczyk raised the issues of total number ,}s of units <br /> allowed, maximum building coverage, aesthetics and environmental <br /> al <br /> J <br /> protection. �f <br /> �`✓` s <br /> Denni Bal z r'a ini and James Dorgan informed the Board that a <br /> x_=- they had made individual informal of theproperty. <br /> Jame ' <br /> ° t s Dorgan pointed out all roof lines in this project are �' • ; � <br /> not clipped; to which Mr. Roberts requested a four week <br /> extension. He suggested the Board approve construction of the , <br /> ti buildings in question in order to compare to the existing <br /> buildings, ,f,1 <br /> ,. <br /> at which time the matter could be discussed. <br /> klul <br /> .. At this point references were being made to a plan which <br /> Applicant r �� <br /> pp provided for overlay purposes - Master Site Plan <br /> Win.dchime Point Revisions 9/26/97. I <br /> The Chairman quoted from Condition #9 The Applicant shall14 <br /> Y not under any circumstances change the <br /> R <br /> , g exterior of the buildings <br /> Y as depicted on the Phasing Plan as Buildings 14, 15, 237 24 25 +, <br /> i <br /> ? 30. 35, 36, and 37, as noted on the plan, ,, , <br /> w <br /> The Town Planner clarified any changes made to said �r '-� Condition <br /> #9 would have to be obtained by way of the Public <br /> Hearing Modification process. <br /> Applicant requested direction from the Board regarding the <br /> request for g ,4 <br /> a four (4) week extension of discussion following <br /> construction of buildings in question. ;01f <br /> r., I <br /> 1 nnin Board M. g embers were very reluctant to approve any <br /> tt; , <br /> type of n chan e" to said buildings without g s ' thout the benefit of a I' <br /> r`A: Public Hearing - - i <br /> ' I <br />