Laserfiche WebLink
64 Fff <br /> I <br /> Town of Mashpee ,f Ml; <br /> Planning Beard <br /> Minutes of Meeting - <br /> June 16, 1999 .3 <br /> The Town of Mashpee Planning Board Me l P g Meeting was called to li <br /> order in Conference Room #1, Mashpee Town Hall, 16 Great Neck <br /> Road North, Mashpee, Massachusetts at 7: 00 p.m. on Wednesday, <br /> June 16► 1999 . The Chairman Kuchinskl, presided. <br /> . <br /> Planning Board Members resent: John +} <br /> . P uchinskz, chairman, <br /> Dennis Balzarini; James Dorgan; Martine Meij Bring; and Beverly <br /> Kane, Associate Member. <br /> New Planning Board Member, Matt Malone was in attendance <br /> however he did not participate in the Meeting since he had not <br /> yet been sworn in by Town Clerk. <br /> JL <br /> Also present: F. Thomas Fudala, Town Planner; Eric Twarog, <br /> Assistant Town Planner, and Charles Rowley, Consulting in <br /> g Engineer <br /> g Weer <br /> 7:0 5 pm. ) . <br /> A quorum being present, the Chairman called the meeting toy.,.. <br /> order. As the first order of business he called the matter of: <br /> Public Hearin <br /> Windchime Point Development Group, Ltd. <br /> Approval of Special Permit Changes: <br /> Monitoring Wells-Unit Designs-Amount of Sewer Bond{ <br /> Upon completion, of reading the Public Hearing Notice, the <br /> Chairman recognized Michael Roberts, Project Manager, Windchime <br /> Point, who requested permission to change the ten (10) units <br /> referenced within the existing Special Permit; that monitoring <br /> inspection be re g <br /> well ins <br /> �? reduced from quarterly to annually; as well as <br /> a reduction in the amount required for <br /> qu the e sewer bond. <br /> It was at this point that the Town Planner informed, the <br /> Board that the Bond has yet to be signed by Mr. Bornstein. <br /> The Chairman made reference to a letter dated June 16, 1999, s <br /> addressed to the Town of Mashpee Planning Board, regarding ' <br /> Evaluation of construction at Windchime Point, y <br /> signed b Charles <br /> �' <br /> L• Rowley, PE,, RLS, Engineering Consultant to Mashpee Planning <br /> Board. <br /> P <br /> Mr. Roberts reported an independent testing lab, Briggs <br /> Engineering, had been contacted b Applicant and asked to perform <br /> testing y PP <br /> at the project location as Mr. Rowley, having been r <br /> contacted, the day prior, was not available to do so. ' <br /> Mr. Rowley concurred he had been contacted on a Thursday and <br /> asked to make an inspection as Applicant wished to pave the <br />