Laserfiche WebLink
Ilk <br /> �w <br /> k. <br /> S <br /> Mashpee Planning Board ' <br /> Minutes ], <br /> Wednesday,August 4, 1999 <br /> Present: Chairman John Kuchinski <br /> Dennis Balzarini,James Dorgan,Martine Meijering <br /> Beverly Dane,Associate Member i 1 all <br /> it 1 <br /> Absent. Matthew Malone <br /> Also Thomas Fudala,Town Planner <br /> Present: Eric i Twaro Assistant Town Planner ' �. <br /> . g, <br /> Chairman Kuchinski at 7:00 P.M.at the Mash pee Town <br /> Planning Board Meeting opened by P � <br /> Hall,Meeting Room#1,on Wednesday,August 4, 1999. <br /> l <br /> PUBLIC HEARING <br /> APPLICANT ROBERT D. FRATUS JR.ICHRIS COSTA <br /> MODIFICATION OF SUBDIVISION PLAN: ' <br /> ..I- All <br /> Chairman John Kuchinski opened the Public Hearing at 7:00 P.M. Town Planner Tom <br /> Fudala informed the Planning Board that Charles Rowley,Consulting Engineer,has talked to <br /> Chris Costa and that there are two versions of the retaining wall and Mr.Rowley is okay with4 i <br /> both of them. He noted that they were expecting Mr.Costa to be present at the meeting. ' <br /> P g r <br /> IN' <br /> +y k <br /> Attorney J.Alexander Watt was present representing the Applicant. <br /> After a few minutes wait,Applicant Chris Costa showed up at the meeting. <br /> 40 <br /> Applicant: Robert D.Fratus,Jr./Chris Costa <br /> -1 <br /> Location: Route 130 North of Chop`n Block, <br /> Assessors Map 27,Blocks 122,124-134 <br /> Modification of subdivision plan:eliminate lots and <br /> Request: r ; <br /> "Village Way." <br /> Continued from July 21,1999. �' `_` i <br /> ;. <br /> Mr.Costa stated that he did not bring a set of the wall plans because he thought gh Charles „ <br /> ,. II <br /> Rowley,Consulting Engineer,would be present at the meeting with his set of plans. He <br /> stated that he can get a set of plans in the morning for the Planning Board,if required. <br /> r <br /> roadway in the a Ixeant decided to go with a retaining <br /> He stated that in order to get the r y pp t i <br /> . designed two methods. The applicant <br /> wall. The Engineer who designed the retaining wall d gn PP <br /> will price it out and determine which method is more economical. <br /> • planning Boar there were questions f� <br /> Mr.Costa noted that last time he had met with the g d, <br /> %and the changed it to 8%. The draining was then '�I •`, <br /> concerning the slope—they had�t at 10 y g <br /> moved to the opposite side of the road. r� <br /> He noted that they would be paving 20 feet of roadway. 'E <br /> .'1I�• <br />