Laserfiche WebLink
County Laboratory for analysis. And. that as of this date <br /> the survey bounds have been installed by Cape & Islands <br /> Engineering, Inc. <br /> The Town Planner acknowledged written confirmation <br /> from Cape & Islands Engineering, Inc. that said work has <br /> been completed. <br /> Mr. Shay then requested the release of Performance <br /> Guarantee for Lot 8, and discussion regarding the release <br /> for Lot 10. <br /> The Town Planner determined that the Planning Board <br /> could consider both lots for release this evening. He also <br /> stated that the Consulting Engineer- has made a satisfactory <br /> inspection of the drainage and bounding issues . The water <br /> quality sampling issues are required by zoning, not <br /> Subdivision Control. <br /> The Town Planner inquired and Applicant agreed to add <br /> the description of Lot #10 to the forma,l request for <br /> release of thePerformance Guarantee. <br /> There being no further Planning Board discussion the <br /> Chairman entertained a motion. <br /> MOTION : Dennis Bal arini made. a Motion to release the <br /> Performance Guarantee for Lot #8 and Lot #10 on Antunes <br /> Avenue; which Motion was- duly seconded by Lee Gu.rney and so <br /> voted Uinanimous.ly.. <br /> Having determined this to be the 'free act and deed of <br /> the Planning Board, the Board Secretary notarized three <br /> copies of "Release of Covenant Agreement, Lots #8 and 10, <br /> Subdivision in Mashpee, Louis and Ethellen Antune , <br /> Owners . " <br /> Signed by: Beverly Kane, Dennis Bal arini, Lee Gurney, <br /> John Ha l ach i , and Myrna: Nuey. <br /> With reference to the issue of water sampling and the <br /> issuance of building permits, the following motion was <br /> made. <br /> MOTION,: Lee -Gurney made a Motion directing the <br /> Planning Office to prepare a. memo stating the Planning <br /> Board decision to support the issuance of building permits <br /> 4 <br />