Laserfiche WebLink
a <br /> mentioned that at some point a retaining wall might be <br /> required due to lowering the building elevation. <br /> The Town Planner reminded the- Board that further <br /> changes to the Special. Permit may be necessary pending the <br /> Design Review decision (revised landscape plan) . In the <br /> evert of grade changes a.nd revised site plan, said changes <br /> could be viewed, prrocedurally, as minor site plan charges. <br /> Water Quality Deport ha-s been provided.. <br /> There is Stormwater i an .genie t Plan Bioretention <br /> Facility. <br /> Traffic Impact Report, by Connolly Associates, dated <br /> May 25, 2006 has been submitted. <br /> Both Mr. Rowley and Design Review Committee comments <br /> have been properly addressed. <br /> Review of Conditions included Plans, Signage, <br /> Landscape Plan requirements, approval by the Design Review <br /> Committee, Building Permit requirements, 40B Mousing <br /> Project re quirements t revegetation/maintenance of the <br /> sloped area, location of lot lime division. <br /> Curb out approval from the Department of .Public <br /> Works . <br /> Dumpster access signage. <br /> Project landscaping to be inspected -by the Town <br /> Planner. <br /> Vegetation regulations within the biorention facility. <br /> Paving regulations/completion of the bior,etention <br /> facility area. The Consulting Engineer explained the <br /> importance of said requirement based upon the -roper <br /> function and efficiency of the drainage system. <br /> Potential future building site requirement . <br /> Selectmen approval of completed construction. <br /> Approved uses as listed in the Ihpee Zoning Bylaw. <br />