Laserfiche WebLink
f f <br /> 18 - Required sprinkler and fire alarm systems . <br /> 19 Required street address and unit numbers. <br /> 20 - required submission of as-built plans for the <br /> underground utilities. <br /> 21 - Denitrification wastewater system/quality testing <br /> requirements . <br /> 22 - cooperation with the Mashpee Serer commission. <br /> 23 Drainage requirements. <br /> - Stormwater operations and maintenance plan <br /> requirements. <br /> 2 - cost responsibilities. <br /> Curbing and berm requirements . <br /> Irrigation system requirements. <br /> Construction activity guidelines . <br /> Proper disposal of construction waste . <br /> 26 chemical restrictions. <br /> 27 Required approval from the Board of Health <br /> regarding t-he use of fertilizers and pesticides . <br /> 28 - Underground storage tanks are prohibited. <br /> 29 - Regulation for transfer of ownership. <br /> o -- Applicant' s rights to pledge assign its rights <br /> under the Special Permit to an institutional construction <br /> lender. <br /> 1 - Procedure in the event of discovery of human <br /> remains . <br /> 2 - Special Permit conditions are binding to the <br /> applicant as well as successors-.in-interest and assigns. <br /> 33 - conditions of violations. <br />