My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/20/2002 PLANNING BOARD Minutes
>
03/20/2002 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 3:34:31 PM
Creation date
1/25/2022 2:42:53 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
03/20/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DEPARTMENT OF THE ARMY AND THE AIR FORCE <br /> AIR NATIONAL GUARD <br /> 1411 JEFFERSON DAVIS HIGHWAY <br /> ARLINGTON, VA 22202-3231 <br /> 24 April 2002 <br /> TO: Richard Joyal <br /> FROM: ANGIC4AT <br /> 1411 Jefferson Davis Highway <br /> Arlington, VA 22202-3231 <br /> SUBJECT: OBSTACLE EVALUATION# 2002-ANE-215-OE <br /> 1. An obstacle evaluation was conducted on# 2002-ANE-215-OE for any impacts to <br /> the instrument procedures at Otis ANGB, MA. It was determined that due to <br /> present obstacles in the area that this tower could be built to 154' AGL (269'MSL) <br /> with no impact to the instrument procedures at Otis ANGB. <br /> 2. Any height above 154'AGL (269'MSL) would raise the TACAN RWY 32 MDA to <br /> 560 vice 520 due to the obstacle location in the final primary surface area. <br /> 3. C4A point of contact is Everett Oakes, COM (703) 607-2389 or DSN 327-2389. <br /> Everett Oakes <br /> Chief Analyst, ANG TERPS <br />
The URL can be used to link to this page
Your browser does not support the video tag.