My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/20/2002 PLANNING BOARD Minutes
>
03/20/2002 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 3:34:31 PM
Creation date
1/25/2022 2:42:53 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
03/20/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
April 11, 2002 <br /> Richard Joyal <br /> 19 Brentwood Lane <br /> Yarmouthport,MA 02675 <br /> Re: Proposed Tower Site <br /> 90 Echo Road <br /> Mashpee, AM <br /> Dear Mr. Joyal: <br /> As you are aware, Turing Mill Consultants, Inc..is currently performing site acquisition <br /> services for Bechtel Communications and AT&T Wireless Services. Currently we are <br /> pursuing on behalf of Bechtel Corporation and AT&T.Wireless Services additional site <br /> in Mashpee, 1 site in Sandwich, and 3 sites in Falmouth to work in conjuction with your <br /> proposed site at 90 Echo, Road, Mashpee. These sites have been identified but are in the <br /> process of site acquisition and lease execution. These sites have been picked to work <br /> with your proposed site as an anchor site. <br /> Additional sites evaluated as potential candidates involved development of towers on a <br /> raw land sites. We tried to using existing structures such as NSTAR.utilitypoles in the <br /> Route 130 area, but the lack of elevation made them an unsuitable candidates. Another <br /> site identified as a potential was the top of the Mashpee Town Hall. However, it was <br /> shown using RF Propagation analysis that this site had very little coverage of the <br /> objective, Route 130 towards Sandwich. The existing water tank was not considered a <br /> candidate because it fell outside of the search ring issued to accomplish seamless <br /> coverage along Route 130. <br /> I have enclosed the required propagation plots showing AT&T's existing coverage from <br /> the towers located at Mashpee Industrial Park and Bowdoin Road in Mashpee. As you <br /> can see, without your site, AT&T has a large hole in its'coverage along 130. Plots were <br /> also developed-to illustrate the effectiveness of a site at Echo Road in filling the current <br /> void. <br /> In reponse to your additional request as to'the base station equipment to be installed at the <br /> proposed site, I have included copies of the specifications for the RBS 2106. According <br /> to the compliance engineers, this equipment does comply with all FCC requirements and <br /> will be used on many of the AT&T Wireless Services installations. <br /> Sincerely, <br /> Tyler M ister <br /> Director of Site Acquisition <br />
The URL can be used to link to this page
Your browser does not support the video tag.